Coal | Mid-Tier | Producer | Australia
Last updated 31 October 2026
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Portfolio Aggregate | 1 project
Portfolio mode — asset rows are for context only; tab totals use the company aggregation.
Whitehaven Coal Portfolio
Portfolio
Project information
As at 30 June 2026
Description
As at 30 June 2026
Whitehaven Coal's group portfolio: coal operations in the Bowen Basin in Central Queensland and the Gunnedah Basin in North West New South Wales - two coal mines in Queensland and four in New South Wales (five open cut, one underground), together with the Gunnedah Coal Handling Preparation Plant, plus two development projects (the Vickery Extension Project and the Winchester South Project). Whitehaven describes itself as a leading Australian metallurgical coal producer and a supplier of high quality, high calorific value thermal coal; FY26 revenue split 57% metallurgical and 43% thermal coal sales. Managed ROM coal production was 40.3Mt in FY26 (FY25 39.1Mt), with FY27 Group ROM guidance of 38.0-41.0Mt. Coal is railed under Aurizon and ARTC track and haulage contracts and exported mainly to Asia through Dalrymple Bay and RG Tanna (QLD) and the Port of Newcastle via PWCS and NCIG (NSW). Total Coal Resources fell from 6.80Bt (FY25) to 5.78Bt, mainly on the removal of Oaklands North (-950Mt) and Bonshaw (-11Mt).
Portfolio Aggregate
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 30 June 2026
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Operating | 9 projects
Blackwater
Asset | Ownership 70%
Project information
As at 30 June 2026
Description
As at 30 June 2026
Open cut mine in the Bowen Basin, Central Queensland, producing metallurgical and thermal coal, held through the Blackwater Joint Venture after Whitehaven sold 20% to Nippon Steel Corporation and 10% to JFE Steel Corporation on 31 March 2025. FY26 ROM coal production was 13.9Mt, down 2% on FY25 (14.2Mt) on wet weather at the start of H2 FY26 and site water management; coal stocks were 1.5Mt at 30 June 2026. Exports go through the RG Tanna Coal Terminal. The Coal Resource also includes an underground area. Whitehaven names Blackwater among the core assets where its Resource inventory is concentrated; life of mine 50+ years.
Mining metrics
Multiple effective dates | inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 30 June 2026
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Vickery
Asset | Operating
Project information
As at 30 June 2026
Description
As at 30 June 2026
Open cut thermal and metallurgical coal mine near Gunnedah, New South Wales. Early mining began with the box cut in late FY24 and contributes to the Gunnedah open cut output; the full-scale Vickery Extension Project has all required Government approvals (approved to August 2045) but remains subject to Board approval of FID; full-scale development could unlock annual ROM production of 10Mt (about 8Mt above current early-mining levels) over a 20-year open cut mine life, with high CV coal (>6400 kcal/kg). The Coal Resource also includes an underground area. Whitehaven names Vickery among its core near-development assets; life of mine 20+ years.
Mining metrics
As at 30 June 2026 | inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 30 June 2026
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Maules Creek
Asset | Ownership 75%
Project information
As at 30 June 2026
Description
As at 30 June 2026
Open cut thermal and metallurgical coal mine in the Gunnedah Basin, North West New South Wales, held through the Maules Creek Joint Venture. FY26 ROM coal production was 11.7Mt, 2% higher than FY25 (11.5Mt), with strong processing and logistics throughput; coal stocks 1.1Mt at 30 June 2026. Coal is railed via the Boggabri-Maules Creek rail spur (39% JV) and exported through the Port of Newcastle. A Maules Creek Continuation Project is in progress. Whitehaven names Maules Creek among its core assets; life of mine 18+ years.
Mining metrics
Multiple effective dates | inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 30 June 2026
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Narrabri
Asset | Ownership 77.5%
Project information
As at 30 June 2026
Description
As at 30 June 2026
Underground longwall thermal coal mine in the Gunnedah Basin, New South Wales, held through the Narrabri Coal Joint Venture, with Narrabri North and Narrabri South underground areas. FY26 ROM coal production was 4.7Mt, up 11% on FY25 (4.3Mt): solid first-half output after an extended FY25 longwall move, then challenging mining conditions in the second half; coal stocks 0.3Mt at 30 June 2026. The Stage 3 Extension Project extends the approved mine life from 2031 to 2044, with annual production capacity expected at 6-7Mtpa; operations under the Stage 3 approval began on 1 August 2025, and Stage 3 capital is expected between FY27 and FY32, subject to market conditions. FY26 capital included the Narrabri 201 mains development. Life of mine 18+ years.
Mining metrics
Multiple effective dates | inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 30 June 2026
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Daunia
Asset
Project information
As at 30 June 2026
Description
As at 30 June 2026
Open cut metallurgical and thermal coal mine in the Bowen Basin, Queensland, acquired with Blackwater from BMA (FY24). FY26 ROM coal production was 6.2Mt, up 6% on FY25 (5.8Mt) on favourable mining conditions; coal stocks were 0.6Mt at 30 June 2026. Exports go through the Dalrymple Bay Coal Terminal. Winchester South lies adjacent and is studied for synergies with Daunia. Life of mine 14+ years.
Mining metrics
Multiple effective dates | inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 30 June 2026
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Tarrawonga
Asset
Project information
As at 30 June 2026
Description
As at 30 June 2026
Open cut thermal and metallurgical coal mine near Gunnedah, New South Wales, one of the Gunnedah open cut (GOC) mines with Vickery; coal is processed at the Gunnedah CHPP. The Coal Resource also includes an underground area. Life of mine 5+ years.
Mining metrics
As at 30 June 2026 | inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 30 June 2026
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Whitehaven Coal Gunnedah Open Cuts
District
Project information
Description
The Gunnedah open cut (GOC) mines, comprising Vickery and Tarrawonga near Gunnedah. Combined ROM coal production was 3.7Mt in FY26, 13% higher than FY25 (3.3Mt), with an increased contribution from Vickery; the GOC mines held coal stocks of 0.3Mt at 30 June 2026.
Mining metrics
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Whitehaven Coal NSW Operations
Segment
Project information
Description
Whitehaven's NSW Operations reporting segment in the Gunnedah Basin: Maules Creek, the Narrabri underground mine and the Gunnedah open cuts (Vickery and Tarrawonga), largely thermal coal, with the Gunnedah CHPP. Managed ROM coal production was 20.2Mt in FY26, up 6% on FY25 (19.1Mt); sales of produced coal 16.8Mt; coal stocks 1.8Mt at year end; FY27 ROM guidance is 19.2-20.7Mt. Coal is exported through the Port of Newcastle (PWCS and NCIG).
Mining metrics
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Whitehaven Coal QLD Operations
Segment
Project information
Description
Whitehaven's QLD Operations reporting segment: the Daunia and Blackwater open cut mines in the Bowen Basin, largely metallurgical coal. Managed ROM coal production was 20.1Mt in FY26 (FY25 20.0Mt), sales of produced coal 15.9Mt and coal stocks 2.1Mt at year end; FY27 ROM guidance is 18.8-20.3Mt. Coal is exported through the Dalrymple Bay and RG Tanna coal terminals.
Mining metrics
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Development | 1 project
Winchester South
Asset | Feasibility
Project information
As at 30 June 2026
Description
As at 30 June 2026
Proposed metallurgical coal mine (Winchester South Metallurgical Coal Project) in Queensland's Bowen Basin, adjacent to the Daunia mine, under MDL 183. Queensland DETSI has approved the Draft Environmental Authority and the Commonwealth EPBC process is progressing; objections to the Draft Environmental Authority and Mining Lease Applications were referred to the Queensland Land Court, which reserved judgement after closing submissions in December 2025. Whitehaven is continuing feasibility studies, including synergies with Daunia; the mine has the potential to produce up to 17Mt of ROM coal a year over about 30 years. FY26 Reserves rose by 24Mt recoverable and 25Mt marketable as Inferred coal within the pit shell was upgraded and the South Pit and Northwest Pit were included. The resource includes an underground area.
Mining metrics
As at 30 June 2026 | inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 30 June 2026
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Exploration | 3 projects
Ferndale
Asset | Exploration | Ownership 92.5%
Project information
As at 30 June 2026
Description
As at 30 June 2026
Coal resource area in New South Wales (EL7430), held through the Ferndale Joint Venture, with open cut and underground Coal Resources in the FY26 statement and no Coal Reserve.
Mining metrics
As at 30 June 2026 | inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 30 June 2026
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Gunnedah
Asset | Exploration
Project information
As at 30 June 2026
Description
As at 30 June 2026
Coal resource area in New South Wales (ML1624, EL5183, CCL701) with open cut and underground Coal Resources in the FY26 statement and no Coal Reserve.
Mining metrics
As at 30 June 2026 | inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 30 June 2026
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Pearl Creek
Asset | Exploration | Ownership 70%
Project information
As at 30 June 2026
Description
As at 30 June 2026
Coal resource area in Queensland (MDL512, EPC862, EPC863, EPC1063) held through the Dingo Joint Venture, with an open cut Coal Resource. In FY26 a geostatistical review reduced resource confidence (-13Mt) and highlighted the need for additional drilling.
Mining metrics
As at 30 June 2026 | inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 30 June 2026
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reclamation | 1 project
Rocglen
Asset | Reclamation
Project information
As at 30 June 2026
Description
As at 30 June 2026
Former open cut coal mine in New South Wales (ML1620) where Whitehaven has completed operations; it still carries small open cut and underground Coal Resources in the FY26 statement.
Mining metrics
As at 30 June 2026 | inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 30 June 2026
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Assumptions
- The projects listed here reflect the information captured in this workspace and are not necessarily a complete picture of the company's portfolio. For authoritative figures, refer to the company's official filings.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
How to read this tab
- The tables below list unit codes most often used in the Energy Metals sector for this company. MetalPilot stores contained metal or product in the codes below; grade and tonnage use separate fields. In side-by-side comparison views (stock page Portfolio tab, watchlist By sector), heterogeneous source units are converted to each commodity's preferred display unit (for example Moz Au, kt Cu, MMbbl oil) before summing; the same canonical codes appear in project data.
What the Portfolio tab shows
- The Portfolio tab presents a project-level view of the company's reported assets, built from publicly disclosed information (technical reports, annual filings, MD&A, investor presentations, MRMR / R&R statements, NI 43-101 / NI 51-101 / SEC S-K 1300 / SEC S-K 1200 / JORC / SAMREC / PERC / PRMS / COGEH filings, and similar primary sources).
- Figures are grouped by project type (mining, oil & gas, royalty, stream, processing facility, development, portfolio aggregate) and are shown alongside the headline reserve base, headline production, headline grade / quality, cost benchmarks, estimated lifetime, commercial terms (for royalties / streams), operational capacity (for processing) and a single-figure rating where the underlying data supports one.
- Each data table on the Portfolio tab is followed by ONE Assumptions footnote describing the modelling choices for that table; KPI stat-card assumptions appear in the bottom block instead. All legal and section disclaimers are merged into a single disclaimer list at the bottom of the Portfolio tab.
Concepts in your sector — Energy metals (uranium)
- U₃O₈ vs U metal. Reserves are usually in lb or t U₃O₈; multiply by ~0.848 for U metal. Fuel-cycle contracts may quote kgU as UF₆ (schema: kgu).
- % U₃O₈ vs ppm U₃O₈. Athabasca grades can exceed 10%; ISR deposits often 0.05–0.5%. The schema preserves the source unit.
- ISR vs conventional. ISR tonnage is often m³ leach solution, not rock mass — cost structure differs from underground/open-pit.
Portfolio tab — table guide
- Portfolio KPIs — company-level headline numbers aggregated from the featured projects (project counts, attributable annual production by commodity, attributable resource base by commodity, last filing date, operator share). USD value lines multiply attributable volumes by the resolved snapshot price.
- Portfolio snapshot — one-screen summary of the portfolio: counts by type and status, country mix, reporting standards used, operator share, primary commodity, attributable annual production summary and attributable resource base summary.
- Mining — one row per mining project, with columns for project name, location, status, primary commodities, production (with rating), reserves & resources (with rating), grade (with rating), costs and estimated lifetime. Multi-commodity projects emit one summary row per commodity.
- Royalty — one row per royalty interest held by the company. Columns cover the underlying project, operator, commodity, commercial terms (rate, type, cap, area-of-interest), attributable production, attributable reserves and estimated lifetime.
- Stream — one row per metal stream held by the company. Each row shows the underlying project, the streamed commodity, the headline stream percentage, the ongoing per-ounce / per-tonne payment, and attributable production / reserves.
- Processing facilities — one row per midstream / processing facility (pipeline, fractionator, LNG train, storage cavern, refinery, smelter, mill, heap-leach pad, CPP, etc.). Columns include nameplate capacity, contracted capacity, feedstock commodities and operational footprint.
- Development — projects in development status or in a pre-production lifecycle phase. The production column is re-labelled 'Targeted production (rating)' to highlight that the figures are plans, not actuals.
- Portfolio Aggregate — a single company-level row used when the company itself publishes a portfolio rollup (e.g. company-wide 2P barrels across all properties).
- Reserves & resources — detail — a leaf-category pivot showing every reserve and resource category disclosed across the projects.
- NPV (grouped) — all NPV rows captured from the filings, grouped by commodity, resource category, development status and pricing case. Each NPV figure is shown with its discount rate, basis (before-tax / after-tax), currency and value scale.
Ownership / Working interest
- Ownership percentage means the company's working-interest share of the asset: its slice of the project before royalties and before government take. It is shown on a 0–100 scale.
- Mines, oil and gas fields, and processing facilities — this is how much of the asset belongs to the company under that working-interest idea. One hundred percent is fully owned; a lower number usually means partners share the rest.
- Royalties and streaming agreements — the percentage is often not the story; what matters economically is usually the royalty or stream rate, shown elsewhere alongside these figures.
- Oil and gas — read this as gross working interest only. Do not treat it as net production or net wells after royalties; when filings distinguish gross from net, that shows up in how the resource numbers themselves are labelled.
- Below 100% — the short summary for each project names other owners and their stakes when the source says who they are.
- NRI vs WI (O&G). Working interest (WI) is the obligation to pay a share of costs; net revenue interest (NRI) is the share of revenue after royalties and overriding-royalty interests. A 100% WI well rarely produces 100% NRI; typical onshore U.S. NRI is 75–87.5% of WI depending on the lease royalty.
- Operator vs non-operator. The operator runs day-to-day operations; non-operating partners pay their WI share of costs but do not run the asset. Some Portfolio rows show operator share where disclosed.
- Consolidation method — how the issuer accounts for the asset. Separate from how much the company owns (ownership %) and who operates it, this accounting treatment decides whether an asset's figures sit inside the company's reported group totals or are stripped out to a single net line. It applies to operating assets (mines, oil & gas fields, processing facilities) and is left blank for royalties, streams, and company-level portfolio rollups.
- Consolidated — the company controls the asset and includes 100% of its figures in the group total; the portion it does not own is carried as a non-controlling interest (NCI). Control is not the same as a majority, so a company can consolidate an asset it holds less than half of. Where ownership is below 100%, the Portfolio shows the NCI percentage (100 minus the company's stake).
- Proportionate — a jointly-operated asset the company includes at its own share, line by line; the share is inside the group total.
- Equity method — an associate or joint venture shown on a single net line, with its revenue excluded from the group total. This is the usual reason a company's reported total is smaller than the sum of its individual assets; the Portfolio flags the share of a commodity total that is equity-accounted.
- Cost / other — a passive or fair-value holding, excluded from the group total.
Unit codes, conversion cheat sheets, cost benchmarks (AISC, C1–C3), reporting standards (NI 43-101, JORC, SEC S-K 1300) and resource/reserve category definitions live in the full terminology & units reference.
Each table lists the numeric band for scores 1–5 (production and resource base; grade where applicable for mining commodities) using the same thresholds as project rating stat cards. Only commodities that appear on featured projects for this document are listed.
Thermal coal
Met coal
Copper uses kt Cu bands; lb-scale copper resources are converted to kt. Lithium grade uses hard-rock % Li₂O bands unless brine-style extraction or brine units appear on featured projects.
Assumptions
- Presented values are denominated in currency of the country where the company is headquartered. Values like market capitalization might differ from the values visible in other parts of the page, where the currency is always USD.
Commodity guides
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.