Narrabri — thermal coal mine
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 30 June 2026
Description
As at 30 June 2026
Underground longwall thermal coal mine in the Gunnedah Basin, New South Wales, held through the Narrabri Coal Joint Venture, with Narrabri North and Narrabri South underground areas. FY26 ROM coal production was 4.7Mt, up 11% on FY25 (4.3Mt): solid first-half output after an extended FY25 longwall move, then challenging mining conditions in the second half; coal stocks 0.3Mt at 30 June 2026. The Stage 3 Extension Project extends the approved mine life from 2031 to 2044, with annual production capacity expected at 6-7Mtpa; operations under the Stage 3 approval began on 1 August 2025, and Stage 3 capital is expected between FY27 and FY32, subject to market conditions. FY26 capital included the Narrabri 201 mains development. Life of mine 18+ years.
Mining metrics
Multiple effective dates | inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 30 June 2026
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.