Gold | PGM | Senior | Producer | USA | Europe | South Africa
Last updated 31 October 2026
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Portfolio Aggregate | 1 project
Portfolio mode — asset rows are for context only; tab totals use the company aggregation.
Sibanye-Stillwater Portfolio
Portfolio | Operating
Project information
As at 31 December 2025
Description
As at 31 December 2025
Group-level attributable Mineral Resources (exclusive of Mineral Reserves) and Mineral Reserves of Sibanye-Stillwater as at 31 December 2025, declared under SAMREC, Section 12 of the JSE Listings Requirements and SEC S-K 1300 for managed operations, with non-managed properties prepared under JORC or NI 43-101. The group overview totals PGM (4E at the SA operations, 2E at the US operations), gold, lithium (LCE), uranium oxide, copper and zinc. Mineral Resources are reported on an attributable basis with metal content also stated on a 100% basis. SA estimates use ZAR18.24:US$.
Portfolio Aggregate
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Operating | 15 projects
Driefontein
Asset
Project information
As at 31 December 2025
Description
As at 31 December 2025
Driefontein is a managed underground gold operation in the Witwatersrand Basin, 100% held, and one of the Group's individually disclosed material properties under S-K 1300. In 2025 depletion of 0.2Moz was offset by one-year life extensions at 4 shaft and 5 shaft (+0.3Moz); Mineral Resources fell with the exclusion of inaccessible areas relating to infrastructure.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Marikana
Asset | Ownership 80.64%
Project information
As at 31 December 2025
Description
As at 31 December 2025
The Marikana operation is located in the Marikana district, 40km east of Rustenburg in North West province, with a lease area of about 214km2. The Group considers Marikana material for the purpose of SK-1300. It has five operating shafts (K3, K4, Rowland, Saffy and E3) mining the Merensky and UG2 reefs, predominantly by conventional methods, plus two tailings retreatment operations (ETD2 via the BTT plant and the ETTP plant). Ore is processed in on-site concentrators, a smelter and base metal refinery, with final refining at the precious metal refinery in Brakpan. Production shown excludes purchase of concentrate from third parties.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Rustenburg
Asset | Ownership 74%
Project information
As at 31 December 2025
Description
As at 31 December 2025
The Rustenburg operation (SRPM) in North West province mines the Merensky and UG2 reefs of the western Bushveld Complex and, following the amalgamation of the operations, now includes Kroondal; Mineral Resources and Mineral Reserves have been consolidated under SRPM and production and costs are presented including Kroondal. Sibanye-Stillwater's attributable interest is 74% (Kroondal 87% in 2024). Rustenburg is one of the Group's individually disclosed material properties under S-K 1300. Surface sources include the Western Limb tailings retreatment plant.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Kloof
Asset
Project information
As at 31 December 2025
Description
As at 31 December 2025
Kloof is a managed underground gold operation in the Witwatersrand Basin, 100% held, and one of the Group's individually disclosed material properties under S-K 1300. Production constraints, including geotechnical considerations that led to the removal of isolated blocks of ground, impaired its economic viability and led to a writedown of the majority of its Mineral Reserves (-1.4Moz) and a shortened life of mine; Mineral Resources below 35 level (7 shaft closure) and most high-grade VCR resources were excluded.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
East Boulder
Asset
Project information
As at 31 December 2025
Description
As at 31 December 2025
The East Boulder mine (100%) is an underground PGM mine, part of the US PGM operations, whose Mineral Resources and Mineral Reserves are tabled together with Stillwater; the integrated report states its 2E Mineral Reserves separately.
Mining metrics
As at 31 December 2025 | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Stillwater
Asset
Project information
As at 31 December 2025
Description
As at 31 December 2025
The Stillwater mine (100%) is an underground PGM mine, part of the US PGM operations, whose Mineral Resources and Mineral Reserves are tabled together with East Boulder; the integrated report states its 2E Mineral Reserves separately.
Mining metrics
As at 31 December 2025 | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Beatrix
Asset
Project information
As at 31 December 2025
Description
As at 31 December 2025
Beatrix is a managed underground gold operation, 100% held. Its life of mine was extended by three years through the inclusion of below-infrastructure mining, an extension into the Vlakpan area and a reduced production rate.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
DRDGOLD
Asset | Ownership 50.1%
Project information
As at 31 December 2025
Description
As at 31 December 2025
DRDGOLD is a 50.10%-held, non-managed gold tailings retreatment business in South Africa, consolidated by the Group. Its Mineral Resources declined with the removal of the Daggafontein TSF, reclassified as a depositional site, and the Grootvlei TSF due to regulatory and legal considerations. Its reserves are based on a gold price of ZAR1,689,997/kg.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Cooke
Asset | Ownership 76%
Project information
As at 31 December 2025
Description
As at 31 December 2025
The Cooke operation (76% attributable, managed) mines historical surface tailings facilities and rock dumps (Randfontein Surface Operations), processed at the Cooke and Ezulwini plants; its four vertical shafts are on care and maintenance. The feasibility study into exploiting the Cooke TSF for gold and uranium was completed, yielding a maiden uranium Mineral Reserve and the first inclusion of the TSF gold content.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Mimosa
Asset | Ownership 50%
Project information
As at 31 December 2025
Description
As at 31 December 2025
Mimosa is a non-managed underground PGM operation in Zimbabwe in which Sibanye-Stillwater holds a 50% interest. It is equity accounted, so its results are excluded from Group revenue and cost of sales and from the SA PGM unit cost benchmarks; production is reported on an attributable (50%) basis.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Century
Asset
Project information
As at 31 December 2025
Description
As at 31 December 2025
The Century zinc tailings retreatment operation in Australia (100%) retreats a finite tailings storage facility and includes on-lease in-situ exploration resources. Mineral Reserves declined solely on depletion; the TSF will be depleted by mid-2027, and the Group is studying commercial options, including regional phosphate mining partnerships, to extend the life of the processing plant, pipeline, port facility and shipping vessel.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Platinum Mile
Asset
Project information
As at 31 December 2025
Description
As at 31 December 2025
The Platinum Mile tailings retreatment facility, 100% owned and managed, recovers PGMs from historic Rustenburg tailings storage facilities and live tailings streams from the Rustenburg concentrator plants. Platinum Mile operations remain on a purchase of concentrate agreement with Valterra Platinum Limited.
Mining metrics
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Stillwater and East Boulder
District
Project information
As at 31 December 2025
Description
As at 31 December 2025
The US PGM operations comprise the Stillwater and East Boulder underground mines, reported together for Mineral Resources and Mineral Reserves (2E: Pt and Pd); the Group treats the US PGM operations as material under S-K 1300 with individual property disclosure. Following the Q4 2024 restructuring, which placed Stillwater West on care and maintenance, mined 2E production fell 33% in 2025. AISC includes Section 45X Advanced Manufacturing Production Credits. Reserves rose on estimation methodology changes, offset by modifying factors and depletion.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Sibanye-Stillwater SA Gold Operations
Segment
Project information
As at 31 December 2025
Description
As at 31 December 2025
The SA gold operations comprise the managed Driefontein, Kloof and Beatrix underground operations, the 76%-held Cooke surface operation, and the 50.10%-held, non-managed DRDGOLD tailings retreatment business, all in the Witwatersrand Basin. Gold Mineral Reserves fell, principally from a writedown of the majority of Kloof's reserves (-1.4Moz) after production constraints and geotechnical considerations, partly offset by a three-year life extension at Beatrix and one-year extensions at Driefontein 4 and 5 shafts. 2026 guidance excludes DRDGOLD.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Sibanye-Stillwater SA PGM Operations
Segment
Project information
As at 31 December 2025
Description
As at 31 December 2025
The SA PGM operations comprise two managed underground operations in the Bushveld Complex, Marikana and Rustenburg (including Kroondal, now consolidated under SRPM), the Platinum Mile tailings retreatment facility, and a 50% interest in the non-managed Mimosa operation in Zimbabwe. PGM is reported as 4E (Pt, Pd, Rh and Au). Mineral Reserves rose to 29.4Moz 4E, mainly from the inclusion of the Marikana E4 mechanised UG2 project after a feasibility study (+2.9Moz) and the Marikana KTD1 TSF (+0.6Moz). Production includes underground and surface sources; unit costs and capital exclude Mimosa, which is equity accounted.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Construction | 1 project
Keliber
Asset | Construction | Ownership 79.82%
Project information
As at 31 December 2025
Description
As at 31 December 2025
The Keliber lithium project in Finland (79.82% attributable, managed, with Finnish Minerals Group) is an advanced, fully integrated lithium development project and one of the Group's individually disclosed material properties under S-K 1300. Construction is due for completion in Q1 2026 with a staged start-up; the current profile includes the Syvajarvi and Rapasaari open pits, whose reserves for the first 18 years are unchanged. Exploration at the Leviakangas and Tuoreetsaaret deposits added to Mineral Resources.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Development | 2 projects
Burnstone
Asset | Feasibility
Project information
As at 31 December 2025
Description
As at 31 December 2025
Burnstone is a 100%-held gold development project in South Africa. A feasibility study into the re-commencement of construction is ongoing, with a decision expected during 2026; the Mineral Resource and Mineral Reserve estimates were revisited as part of this work, adding 0.2Moz to reserves from area inclusions.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Mt Lyell
Asset | Feasibility
Project information
As at 31 December 2025
Description
As at 31 December 2025
The Mt Lyell copper-gold project in Tasmania, Australia (100%) is a study to reopen the historic Mt Lyell underground mine. The Class 2 feasibility study was concluded at the end of 2025, giving a maiden Mineral Reserve; the project envisages a 3Mtpa operation with an initial 23-year life producing about 26ktpa of copper and 16kozpa of gold in concentrate.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Exploration | 6 projects
Southern Free State
Asset | Exploration
Project information
As at 31 December 2025
Description
As at 31 December 2025
The Southern Free State (SOFS) project in the Free State, adjacent to the Beatrix mining right, is a 100%-held gold exploration project that remains fully mining permitted. Its gold Mineral Resources were unchanged year-on-year.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Akanani
Asset | Exploration | Ownership 80.13%
Project information
As at 31 December 2025
Description
As at 31 December 2025
Akanani is an SA PGM exploration project, held 80.13% (attributable, managed). Its 4E PGM Mineral Resources were unchanged year-on-year.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Altar
Asset | Exploration | Ownership 20%
Project information
As at 31 December 2025
Description
As at 31 December 2025
Altar is a non-managed copper-gold porphyry exploration project in Argentina operated by Aldebaran Resources Ltd, which raised its interest to 80% after completing an earn-in. The Group's combined attributable interest is 31.47%, from a 14.34% equity interest in Aldebaran and a direct 20% (40% in 2024) project-level interest. Aldebaran completed a Preliminary Economic Assessment for an open pit operation in 2025; resources are contained within a conceptual pit shell.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Beisa
Asset | Exploration
Project information
As at 31 December 2025
Description
As at 31 December 2025
Beisa is a 100%-held uranium exploration project associated with the Beatrix operation. Its Mineral Resource, previously reported as subject to a pending transaction with Neo Energy Metals expected to close in 2026, is still included.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Limpopo
Asset | Exploration | Ownership 80.64%
Project information
As at 31 December 2025
Description
As at 31 December 2025
The Limpopo SA PGM exploration properties comprise Baobab and Doornvlei (80.64% attributable) and Dwaalkop (40.32% attributable). The 4E PGM Mineral Resources were unchanged year-on-year.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Marathon
Asset | Feasibility | Ownership 12.14%
Project information
As at 31 December 2025
Description
As at 31 December 2025
The Marathon project in Canada, is an advanced-stage PGM-gold-copper exploration project operated by Generation Mining Ltd, in which the Group's shareholding changed from 13.85% to 12.14% during 2025 (non-managed). Its Mineral Resource estimate was updated as part of a revised NI 43-101 feasibility study; resources are reported within an optimised pit shell at an NSR cut-off, excluding gold and silver by-products.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Processing facilities | 5 projects
Sibanye-Stillwater US Recycling
Segment | Other
Project information
As at 31 December 2025
Description
As at 31 December 2025
The US Recycling operations comprise the Columbus autocatalyst recycling site, the Pennsylvania (PA, formerly Reldan) industrial and e-scrap recycling site acquired on 15 March 2024, and the North Carolina (NC, formerly Metallix) site acquired on 4 September 2025, operating under a unified leadership structure. Recycling recorded adjusted EBITDA of US$228 million for 2025. These are non-mineral properties; 2026 production guidance is stated in gold equivalent ounces.
Processing facilities
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Columbus Recycling
Asset | Other
Project information
Description
The Columbus metallurgical complex (100%) recycles PGM autocatalysts. Total PGM ounces fed in 2025 were 308,617 3Eoz, 2% lower year-on-year, and the 3E basket price averaged US$1,383/3Eoz.
Processing facilities
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
North Carolina Recycling
Asset | Other
Project information
Description
The North Carolina (NC) site, formerly Metallix, acquired on 4 September 2025 (100%), adds industrial and e-scrap recycling capacity, logistics and technical capability; it contributed revenue of US$93 million for the four months to 31 December 2025.
Processing facilities
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Pennsylvania Recycling
Asset | Other
Project information
As at 31 December 2025
Description
As at 31 December 2025
The Pennsylvania (PA) site, formerly Reldan, acquired on 15 March 2024 (100%), recycles precious-metal-bearing industrial waste and e-scrap; it processed 8.9 million lbs of industrial scrap in 2025 and recorded adjusted EBITDA of US$65 million.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Sandouville
Asset | Other | Suspended
Project information
Description
The Sandouville nickel refinery in France (100%) received its last nickel matte in January 2025, ramped down production and was placed on care and maintenance after cleaning and closure activities. A GalliCam pre-feasibility study into converting the plant to produce pCAM continued in 2025. It is a non-mineral property.
Processing facilities
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Assumptions
- The projects listed here reflect the information captured in this workspace and are not necessarily a complete picture of the company's portfolio. For authoritative figures, refer to the company's official filings.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
How to read this tab
- The tables below list unit codes most often used in the Precious Metals sector for this company. MetalPilot stores contained metal or product in the codes below; grade and tonnage use separate fields. In side-by-side comparison views (stock page Portfolio tab, watchlist By sector), heterogeneous source units are converted to each commodity's preferred display unit (for example Moz Au, kt Cu, MMbbl oil) before summing; the same canonical codes appear in project data.
What the Portfolio tab shows
- The Portfolio tab presents a project-level view of the company's reported assets, built from publicly disclosed information (technical reports, annual filings, MD&A, investor presentations, MRMR / R&R statements, NI 43-101 / NI 51-101 / SEC S-K 1300 / SEC S-K 1200 / JORC / SAMREC / PERC / PRMS / COGEH filings, and similar primary sources).
- Figures are grouped by project type (mining, oil & gas, royalty, stream, processing facility, development, portfolio aggregate) and are shown alongside the headline reserve base, headline production, headline grade / quality, cost benchmarks, estimated lifetime, commercial terms (for royalties / streams), operational capacity (for processing) and a single-figure rating where the underlying data supports one.
- Each data table on the Portfolio tab is followed by ONE Assumptions footnote describing the modelling choices for that table; KPI stat-card assumptions appear in the bottom block instead. All legal and section disclaimers are merged into a single disclaimer list at the bottom of the Portfolio tab.
Concepts in your sector — Precious metals
- Resources vs Reserves. Resources are geological estimates that could one day be mined; Reserves are the subset with a feasibility study and plausible positive economics. Measured → Indicated → Inferred describe increasing geological uncertainty; Proven → Probable are reserve labels from Measured/Indicated. Inferred resources are not convertible to reserves under most codes.
- Grade (g/t) is the headline number on gold/silver pages. High-grade is often above 5 g/t; >10 g/t is bonanza territory; below 1 g/t is bulk low-grade. Open-pit cut-offs are typically lower than underground.
- AISC (All-In Sustaining Cost) is direct cash costs + sustaining capex + royalties + corporate overhead + reclamation, per ounce produced. C1 strips sustaining capex and corporate overhead. Both are non-GAAP and defined differently across issuers.
- By-product credits. Polymetallic deposits credit by-product value against the main metal cost; negative AISC after credits does not mean the main metal is sold below cash cost.
Portfolio tab — table guide
- Portfolio KPIs — company-level headline numbers aggregated from the featured projects (project counts, attributable annual production by commodity, attributable resource base by commodity, last filing date, operator share). USD value lines multiply attributable volumes by the resolved snapshot price.
- Portfolio snapshot — one-screen summary of the portfolio: counts by type and status, country mix, reporting standards used, operator share, primary commodity, attributable annual production summary and attributable resource base summary.
- Mining — one row per mining project, with columns for project name, location, status, primary commodities, production (with rating), reserves & resources (with rating), grade (with rating), costs and estimated lifetime. Multi-commodity projects emit one summary row per commodity.
- Royalty — one row per royalty interest held by the company. Columns cover the underlying project, operator, commodity, commercial terms (rate, type, cap, area-of-interest), attributable production, attributable reserves and estimated lifetime.
- Stream — one row per metal stream held by the company. Each row shows the underlying project, the streamed commodity, the headline stream percentage, the ongoing per-ounce / per-tonne payment, and attributable production / reserves.
- Processing facilities — one row per midstream / processing facility (pipeline, fractionator, LNG train, storage cavern, refinery, smelter, mill, heap-leach pad, CPP, etc.). Columns include nameplate capacity, contracted capacity, feedstock commodities and operational footprint.
- Development — projects in development status or in a pre-production lifecycle phase. The production column is re-labelled 'Targeted production (rating)' to highlight that the figures are plans, not actuals.
- Portfolio Aggregate — a single company-level row used when the company itself publishes a portfolio rollup (e.g. company-wide 2P barrels across all properties).
- Reserves & resources — detail — a leaf-category pivot showing every reserve and resource category disclosed across the projects.
- NPV (grouped) — all NPV rows captured from the filings, grouped by commodity, resource category, development status and pricing case. Each NPV figure is shown with its discount rate, basis (before-tax / after-tax), currency and value scale.
Ownership / Working interest
- Ownership percentage means the company's working-interest share of the asset: its slice of the project before royalties and before government take. It is shown on a 0–100 scale.
- Mines, oil and gas fields, and processing facilities — this is how much of the asset belongs to the company under that working-interest idea. One hundred percent is fully owned; a lower number usually means partners share the rest.
- Royalties and streaming agreements — the percentage is often not the story; what matters economically is usually the royalty or stream rate, shown elsewhere alongside these figures.
- Oil and gas — read this as gross working interest only. Do not treat it as net production or net wells after royalties; when filings distinguish gross from net, that shows up in how the resource numbers themselves are labelled.
- Below 100% — the short summary for each project names other owners and their stakes when the source says who they are.
- NRI vs WI (O&G). Working interest (WI) is the obligation to pay a share of costs; net revenue interest (NRI) is the share of revenue after royalties and overriding-royalty interests. A 100% WI well rarely produces 100% NRI; typical onshore U.S. NRI is 75–87.5% of WI depending on the lease royalty.
- Operator vs non-operator. The operator runs day-to-day operations; non-operating partners pay their WI share of costs but do not run the asset. Some Portfolio rows show operator share where disclosed.
- Consolidation method — how the issuer accounts for the asset. Separate from how much the company owns (ownership %) and who operates it, this accounting treatment decides whether an asset's figures sit inside the company's reported group totals or are stripped out to a single net line. It applies to operating assets (mines, oil & gas fields, processing facilities) and is left blank for royalties, streams, and company-level portfolio rollups.
- Consolidated — the company controls the asset and includes 100% of its figures in the group total; the portion it does not own is carried as a non-controlling interest (NCI). Control is not the same as a majority, so a company can consolidate an asset it holds less than half of. Where ownership is below 100%, the Portfolio shows the NCI percentage (100 minus the company's stake).
- Proportionate — a jointly-operated asset the company includes at its own share, line by line; the share is inside the group total.
- Equity method — an associate or joint venture shown on a single net line, with its revenue excluded from the group total. This is the usual reason a company's reported total is smaller than the sum of its individual assets; the Portfolio flags the share of a commodity total that is equity-accounted.
- Cost / other — a passive or fair-value holding, excluded from the group total.
Unit codes, conversion cheat sheets, cost benchmarks (AISC, C1–C3), reporting standards (NI 43-101, JORC, SEC S-K 1300) and resource/reserve category definitions live in the full terminology & units reference.
Each table lists the numeric band for scores 1–5 (production and resource base; grade where applicable for mining commodities) using the same thresholds as project rating stat cards. Only commodities that appear on featured projects for this document are listed.
Gold
Silver
Copper
Zinc
Lead
Nickel
Lithium
Uranium
PGM
Palladium
Platinum
Copper uses kt Cu bands; lb-scale copper resources are converted to kt. Lithium grade uses hard-rock % Li₂O bands unless brine-style extraction or brine units appear on featured projects.
Assumptions
- Presented values are denominated in currency of the country where the company is headquartered. Values like market capitalization might differ from the values visible in other parts of the page, where the currency is always USD.
Commodity guides
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.