Sibanye-Stillwater SA PGM Operations — mine
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
The SA PGM operations comprise two managed underground operations in the Bushveld Complex, Marikana and Rustenburg (including Kroondal, now consolidated under SRPM), the Platinum Mile tailings retreatment facility, and a 50% interest in the non-managed Mimosa operation in Zimbabwe. PGM is reported as 4E (Pt, Pd, Rh and Au). Mineral Reserves rose to 29.4Moz 4E, mainly from the inclusion of the Marikana E4 mechanised UG2 project after a feasibility study (+2.9Moz) and the Marikana KTD1 TSF (+0.6Moz). Production includes underground and surface sources; unit costs and capital exclude Mimosa, which is equity accounted.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.