Sibanye-Stillwater Portfolio — gold & copper mine
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Group-level attributable Mineral Resources (exclusive of Mineral Reserves) and Mineral Reserves of Sibanye-Stillwater as at 31 December 2025, declared under SAMREC, Section 12 of the JSE Listings Requirements and SEC S-K 1300 for managed operations, with non-managed properties prepared under JORC or NI 43-101. The group overview totals PGM (4E at the SA operations, 2E at the US operations), gold, lithium (LCE), uranium oxide, copper and zinc. Mineral Resources are reported on an attributable basis with metal content also stated on a 100% basis. SA estimates use ZAR18.24:US$.
Portfolio Aggregate
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.