La Debo
Project information
As at 31 December 2025
Description
As at 31 December 2025
Gold exploration project comprising the G3N and G3S prospects, located in southwestern Cote d'Ivoire approximately 280 km west of Abidjan. Held under a standard multi-stage earn-in joint venture with JOFEMA Holdings Limited allowing Resolute to earn up to 100% of the project. To date approximately 10,037 m RC and 6,600 m diamond drilling have been completed. The 2025 MRE on G3N (8,580kt @ 0.9 g/t for 259 koz Inferred) and G3S (8,978kt @ 1.3 g/t for 384 koz Inferred) totals 643 koz Inferred — a 60% increase over the 400 koz resource quoted by previous explorers. Deposits remain open at depth with G3S grade increasing at depth. Further G3S extension drilling and a Scoping Study planned for H1-H2 2026.
Mining metrics
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.