Bantaco
Project information
As at 31 December 2025
Description
As at 31 December 2025
Satellite gold exploration project forming part of the Mako Life Extension Project (MLEP). Comprises the Bantaco West (Indicated 110koz + Inferred 123koz = 233koz at 0.9 g/t) and Bantaco South (Indicated 88koz + Inferred 44koz = 132koz at 1.3 g/t) prospect areas. The Bantaco permit is adjacent to the Tomboronkoto permit and approximately 20 km east of the Mako processing plant. Initial MRE announced 24 July 2025 and re-run in December 2025 following H2 2025 drilling. Resolute has completed approximately 8,000 m diamond and 64,700 m RC drilling to date. Deposits remain open at depth and along strike.
Mining metrics
As at 31 December 2025 · inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.