Jubilee
Project information
As at 31 December 2025
Description
As at 31 December 2025
Single offshore oil and gas field located approximately 60 km offshore Ghana in water depths of 1,000 to 1,800 meters. Discovered in 2007 with first oil in 2010. Developed via an FPSO designed to provide water and natural gas injection, process and store oil, and export gas through a pipeline to the mainland. The WCTP and DT licenses were extended to 2040 in December 2025, with an amended plan of development including up to 20 additional wells.
Oil & Gas metrics
As at 31 December 2025 · 1P
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.