KJ
JV Akbastau JSC
Mining
Type
Operating
Status
🇰🇿 Kazakhstan
Country
Project information
As at 31 December 2025
Aggregation level:
Asset
Aggregation level:
Asset
Report standard:
Jorc
Report standard:
Jorc
Ownership %:
50
Ownership %:
50
Operator:
Yes
Operator:
Yes
Extraction:
Isr
Extraction:
Isr
Description
As at 31 December 2025
ISR uranium mining joint venture (Kazatomprom 50%; Uranium One 50%) at Budenovskoye deposit Sites 1, 3 and 4 in the Shu-Sarysu province.
Mining metrics
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.