Enterprise
Project information
As at 31 December 2025
Description
As at 31 December 2025
Open-pit hydrothermal nickel deposit forming the second producing asset of the Trident Project, located approximately 12 km from Sentinel. Mineralisation hosted in shale and talc-rich siltstone with a broad sulphide assemblage (vaesite, pentlandite, millerite). First nickel concentrate produced Q2 2023; commercial production declared June 1, 2024. Plant infrastructure shared with Sentinel. 2025 production of 23,184 t Ni at 0.86 % grade. Trident Technical Report effective March 30, 2020.
Mining metrics
Multiple effective dates · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.