Tumas Project
Data compiled from public filings โ information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 30 June 2025
Description
As at 30 June 2025
100%-owned Tumas calcrete-hosted uranium project in Namibia's Erongo Region โ Deep Yellow's flagship development positioned to become the country's fourth uranium mine. The 2025 DFS update (Apr 2025) supports a 30-year LOM at average head grade 298 ppm U3O8 producing on average 2.46 Mlb pa U3O8 (max 3.6 Mlb pa) and processing up to 4.2 Mtpa ore. A maiden Measured Mineral Resource for Tumas 3 of 38.5 Mlb U3O8 @ 255 ppm was delivered in Sep 2024 and the Dec 2024 Ore Reserve update lifted P&P Reserves to 79.5 Mlb U3O8 @ 298 ppm at a US$100/lb pit shell (waste:ore 2.2:1). Final Investment Decision was deferred in April 2025 pending stronger uranium pricing; staged early works and detailed engineering progress in parallel with NamWater/NamPower contracts and project debt financing arrangements (Nedbank Mandated Lead Arranger).
Mining metrics
Multiple effective dates ยท inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources โ detail
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright ยฉ 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.