Tubas Red Sand Project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 24 March 2014
Description
As at 24 March 2014
100%-owned Tubas Red Sand and Tubas Calcrete uranium project in Namibia's Erongo Region. The Tubas Sand JORC 2012 resource sits in sand-hosted surficial uranium mineralization; the Tubas Calcrete resource remains reported under JORC 2004 (28 Feb 2012 announcement) and is under review for re-statement under JORC 2012. Resource totals (combined): 34.0 Mt @ 170 ppm U3O8 (12.7 Mlb) for Red Sand + 7.4 Mt @ 375 ppm (6.1 Mlb) for Calcrete.
Mining metrics
Multiple effective dates | inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 24 March 2014
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.