Midwest — uranium project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
25.17%-held JV in the eastern Athabasca Basin operated by Orano Canada, hosting the Midwest Main and Midwest A deposits. The site is under care and maintenance within the Orano-operated McClean and Midwest CNSC licence. In August 2025 Denison reported a Preliminary Economic Assessment for the MWJV assessing ISR mining of the high-grade Midwest Main deposit, which the AIF describes as technically sound and economically robust with low initial capital costs, a high rate of return and rapid payback; the AIF does not publish the PEA's NPV, IRR, capital or operating cost figures. Planned 2026 work includes a feasibility-level SABRE assessment, environmental studies, an EA update and a CNSC licence amendment permitting receipt of Midwest ore. Neither published Midwest subtotal reconciles to its two deposit rows: indicated shows 50,700 klb against 49,500 klb summed and inferred 18,200 klb against 19,400 klb, an offsetting 1,200 klb suggesting a transposition in the source. Denison's grand totals agree with the deposit rows, not the subtotals; both are carried exactly as disclosed.
Mining metrics
As at 31 December 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.