McClean North — uranium mine
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
The MLJV's producing deposit, mined by the joint venture's patented SABRE surface-access borehole method. A high-pressure water jet is lowered through a sub-half-metre borehole to erode the mineralised horizon, creating cavities up to four metres in diameter; cuttings are lifted to surface as a slurry and screened, and each mined cavity is backfilled with a cemented mixture. Commercial mining restarted in July 2025 after a 2021 field test recovered approximately 1,500 tonnes of ore grading 4% to 11% U3O8. The resource estimate is supported by the January 2007 McClean North Technical Report and has not been re-estimated for the mining that commenced in 2025, so it does not reflect depletion.
Mining metrics
As at 31 December 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.