Smith Ranch-Highland β uranium project
Data compiled from public filings β information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
100%-owned US in-situ recovery operation in Wyoming (including the Highland mill), in care and maintenance since commercial production ceased in 2018. Licensed wellfield capacity 3 Mlb/yr and processing-plant capacity 5.5 Mlb/yr; licence through September 2028. US ISR operations produced 0.1 Mlb in 2025 (residual); no production expected in 2026. Cumulative US ISR production 2002-2025: 33.0 Mlb. Estimated decommissioning cost US$252.4M (including North Butte). 2026 US care and maintenance costs expected at US$14-15M.
Mining metrics
As at 31 December 2025 Β· exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources β detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright Β© 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.