McArthur River / Key Lake โ uranium mine
Data compiled from public filings โ information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
World's largest high-grade uranium mine (McArthur River, ownership 69.805%) and the world's largest uranium mill (Key Lake, 83.33%) โ both Cameco-operated. Blasthole stoping and raiseboring across seven zones (zones 2 and 4 active; zone 1 significantly advanced; zone 4 South in mid-development). Ore is ground and blended to a nominal 5% U3O8 mill feed at Key Lake. Licence term through October 2043; estimated mine life to 2044. 2025 production beat the revised 14-15 Mlb (100%) target at 15.1 Mlb via alternative-feed substitution; extended Key Lake maintenance shutdown planned for Q3 2026. Cumulative Key Lake-only production 1983-2002: 209.8 Mlb. Estimated decommissioning: $51.4M McArthur River, $276.7M Key Lake (100% basis). NI 43-101 technical report dated March 29, 2019.
Mining metrics
As at 31 December 2025 ยท exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources โ detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright ยฉ 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.