Kibali
Project information
As at 31 December 2025
Description
As at 31 December 2025
Kibali is a non-managed gold joint venture in the Democratic Republic of the Congo, managed by Barrick Gold (45% AGA, 45% Barrick, 10% SOKIMO). 2025 attributable production was 303koz at TCC of $1,148/oz, vs 309koz/$935/oz in 2024. The 2% decline reflected lower tonnes treated (shutdown overrun and equipment availability) and a slightly lower head grade (2.79g/t vs 2.82g/t in 2024). TCC per ounce rose 23% on higher operating, consumable and mining costs, higher gold royalties (gold price linked) and lower production.
Mining metrics
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.