Iduapriem
Project information
As at 31 December 2025
Description
As at 31 December 2025
Iduapriem is a managed gold operation in Ghana. 2025 gold production dropped 16% to 199koz from 237koz in 2024 due to an unplanned 17-day Q1 plant shutdown (Beposo TSF lining tear investigation and repair) and lower recovered grades following depletion of higher-grade Cut 2B and Block 5 pits in 2024 (partially offset by Block 7/8 Cut 1 ramp-up in H2). Processing plant throughput 5.1Mt (-5% YoY). TCC rose 33% to $1,482/oz on higher Beposo TSF, mining contractor and royalty costs. FAP work in 2026 focuses on maintenance, mining productivity and fleet optimisation.