Royalty · Mid-Tier · Copper · Gold · Australia · Chile · Europe
Last updated 21 June 2026
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Royalty Operating · 18 projects
Karlawinda
Asset · Royalty · Operating
Project information
As at 30 June 2025
Description
As at 30 June 2025
Elemental 2.0% NSR royalty over the Karlawinda open-pit gold mine in Western Australia operated by Capricorn Metals Ltd. Located in the Pilbara Region, approximately 65 km south-east of Newman, accessed via dirt roads from the Great Northern Highway with power generated on site utilizing natural gas. Property covers east-west striking metasediments in contact with the Sylvania Inlier. First gold poured at the end of June 2021. Expansion of processing facilities approved to allow 6.5Mtpa ore processing and gold delivery of ~150kozpa, targeted for mid-2026.
Royalty interests
As at 30 June 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 30 June 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Caserones
Asset · Royalty · Operating
Project information
As at 31 December 2025
Description
As at 31 December 2025
Elemental 1.3036% NSR royalty over the Caserones open-pit copper-molybdenum mine in the Atacama Region of Chile operated by Lundin Mining Corporation. Located 165 km southeast from Copiapó. Early Miocene Andean copper-molybdenum porphyry deposit hosted in a monzogranite. Production of copper cathode began in March 2013. Total ore mined in 2025 was 36,712kt with average grades of 0.40% copper and 0.011% molybdenum.
Royalty interests
As at 31 December 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Timok - Cukaru Peki
Asset · Royalty · Operating
Project information
As at 31 December 2020
Description
As at 31 December 2020
Elemental 0.3625% NSR royalty over the Timok Project's Brestovac license covering the Cukaru Peki Upper Zone copper-gold mining operation and the Lower Zone porphyry copper-gold resource project in eastern Serbia operated by Zijin Mining Group. Located 5 km south of Bor. High sulfidation style Upper Zone and porphyry style Lower Zone.
Royalty interests
As at 31 December 2020 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2020
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Mt Pleasant
Asset · Royalty · Operating
Project information
Description
Elemental 5.0% NPI or A$10/oz royalty over the Mt Pleasant project in Western Australia operated by Zijin Mining Group Company Limited.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Sisorta
Asset · Royalty · Operating
Project information
Description
Elemental 3.5% - 5% NSR royalty over the Sisorta project in Türkiye operated by Bahar Madencilik.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Bonikro
Asset · Royalty · Operating
Project information
Description
Elemental Royalty Corporation up to 4.5% NSR royalty over the Bonikro project in Cote d'Ivoire operated by Allied Gold Corp.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Balya
Asset · Royalty · Operating
Project information
Description
Elemental Royalty Corporation 4% NSR and other payments royalty over the Balya project in Türkiye operated by Esan.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Korali-Sud
Asset · Royalty · Operating
Project information
Description
Elemental up to 3% NSR royalty over the Korali-Sud (Mali Project) in Mali operated by Allied Gold Corp. The project includes the Korali-Sud small scale mining licence and the Lakanfla exploration licence.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Ballarat
Asset · Royalty · Operating
Project information
Description
Elemental Royalty Corporation 2.5% NSR royalty over the Ballarat project in Australia operated by Victory Minerals Pty Ltd.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Gediktepe Oxide / Sulfide
Asset · Royalty · Operating
Project information
Description
Elemental 2.25% NSR royalty over the Gediktepe Oxide / Sulfide project in Türkiye operated by ACG Metals.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Chapi
Asset · Royalty · Operating
Project information
Description
Elemental 2% NSR royalty over the Chapi project in Peru operated by Minera Pampa de Cobre.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Jasper Hills
Asset · Royalty · Operating
Project information
Description
Elemental 2% GRR royalty over the Jasper Hills project in Western Australia operated by Brightstar Resources Ltd.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Gold Bar South - Afgan
Asset · Royalty · Operating
Project information
Description
Elemental 1% NSR royalty over the Gold Bar South - Afgan project in Nevada operated by McEwen Inc.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Leeville
Asset · Royalty · Operating
Project information
Description
Elemental 1% GSR royalty over the Leeville project in Nevada operated by Nevada Gold Mines.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Mercedes
Asset · Royalty · Operating
Project information
Description
Elemental 1.0% NSR royalty over the Mercedes project in Mexico operated by Highlander Silver Corporation.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Wahgnion
Asset · Royalty · Operating
Project information
Description
Elemental 1.0% NSR royalty over the Wahgnion project in Burkina Faso operated by Société de Participation Minière du Burkina.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Mt Monger
Asset · Royalty · Operating
Project information
Description
Elemental A$1/oz Au production royalty over the Mt Monger project in Western Australia operated by Vault Minerals Limited.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
South Kalgoorlie
Asset · Royalty · Operating
Project information
Description
Elemental A$5/oz production royalty over the South Kalgoorlie project in Western Australia operated by Northern Star Resources Limited.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalty Exploration · 7 projects
Mactung
Asset · Royalty · Exploration
Project information
Description
Elemental Royalty Corporation uncapped 4% NSR royalty over the Mactung tungsten project in Canada operated by Fireweed Metals Corp.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Dugbe
Asset · Royalty · Exploration
Project information
Description
Elemental Royalty Corporation 2.0-2.5% NSR royalty over the Dugbe project in Liberia operated by Mansa Resources Limited.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Challacollo
Asset · Royalty · Exploration
Project information
Description
Elemental Royalty Corporation 2% NSR royalty over the Challacollo project in Chile operated by Aftermath Silver.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Diablillos
Asset · Royalty · Exploration
Project information
Description
Elemental Royalty Corporation 1% NSR royalty over the Diablillos project in Argentina operated by AbraSilver Resources Corp.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Cactus
Asset · Royalty · Exploration
Project information
Description
Elemental Royalty Corporation 0.54% NSR royalty over the Cactus project in Arizona operated by Arizona Sonoran Copper Company.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Berenguela
Asset · Royalty · Exploration
Project information
Description
Elemental Royalty Corporation 1% - 1.25% NSR royalty over the Berenguela project in Peru operated by Aftermath Silver Ltd.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Laverton
Asset · Royalty · Exploration
Project information
Description
Elemental Royalty Corporation 2 - 4% GSR royalty over the Laverton project in Western Australia operated by Genesis Minerals Limited.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Assumptions
- The projects listed here reflect the information captured in this workspace and are not necessarily a complete picture of the company's portfolio. For authoritative figures, refer to the company's official filings.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
How to read this tab
- MetalPilot stores contained metal or product in the codes below; grade and tonnage use separate fields. In side-by-side comparison views (stock page Portfolio tab, watchlist By sector), heterogeneous source units are converted to each commodity's preferred display unit (for example Moz Au, kt Cu, MMbbl oil) before summing; the same canonical codes appear in project data.
What the Portfolio tab shows
- The Portfolio tab presents a project-level view of the company's reported assets, built from publicly disclosed information (technical reports, annual filings, MD&A, investor presentations, MRMR / R&R statements, NI 43-101 / NI 51-101 / SEC S-K 1300 / SEC S-K 1200 / JORC / SAMREC / PERC / PRMS / COGEH filings, and similar primary sources).
- Figures are grouped by project type (mining, oil & gas, royalty, stream, processing facility, development, portfolio aggregate) and are shown alongside the headline reserve base, headline production, headline grade / quality, cost benchmarks, estimated lifetime, commercial terms (for royalties / streams), operational capacity (for processing) and a single-figure rating where the underlying data supports one.
- Each data table on the Portfolio tab is followed by ONE Assumptions footnote describing the modelling choices for that table; KPI stat-card assumptions appear in the bottom block instead. All legal and section disclaimers are merged into a single disclaimer list at the bottom of the Portfolio tab.
Concepts in your sector — Royalties & streaming
- A royalty is a contractual share of value extracted (NSR, GRR, NPI, sliding-scale, …). A stream delivers a fixed % of production at an agreed (often discounted) price in exchange for upfront capital.
- Portfolio shows operator reserves restated on royalty/stream economics (volume × rate). Operator classification (NI 43-101, JORC, NI 51-101, SEC) carries through.
- Common terms: Cap (maximum payable); Buy-back (operator repurchase right); AOI (area of interest); Sliding-scale (rate vs commodity price).
Portfolio tab — table guide
- Portfolio KPIs — company-level headline numbers aggregated from the featured projects (project counts, attributable annual production by commodity, attributable resource base by commodity, last filing date, operator share). USD value lines multiply attributable volumes by the resolved snapshot price.
- Portfolio snapshot — one-screen summary of the portfolio: counts by type and status, country mix, reporting standards used, operator share, primary commodity, attributable annual production summary and attributable resource base summary.
- Mining — one row per mining project, with columns for project name, location, status, primary commodities, production (with rating), reserves & resources (with rating), grade (with rating), costs and estimated lifetime. Multi-commodity projects emit one summary row per commodity.
- Oil & Gas — one row per O&G project (typically a field, licence, play or basin asset), with columns for location, status, primary hydrocarbons, production (with rating), reserves & resources (with rating), costs and estimated lifetime.
- Royalty — one row per royalty interest held by the company. Columns cover the underlying project, operator, commodity, commercial terms (rate, type, cap, area-of-interest), attributable production, attributable reserves and estimated lifetime.
- Stream — one row per metal stream held by the company. Each row shows the underlying project, the streamed commodity, the headline stream percentage, the ongoing per-ounce / per-tonne payment, and attributable production / reserves.
- Processing facilities — one row per midstream / processing facility (pipeline, fractionator, LNG train, storage cavern, refinery, smelter, mill, heap-leach pad, CPP, etc.). Columns include nameplate capacity, contracted capacity, feedstock commodities and operational footprint.
- Development — projects in development status or in a pre-production lifecycle phase. The production column is re-labelled 'Targeted production (rating)' to highlight that the figures are plans, not actuals.
- Portfolio Aggregate — a single company-level row used when the company itself publishes a portfolio rollup (e.g. company-wide 2P barrels across all properties).
- Reserves & resources — detail — a leaf-category pivot showing every reserve and resource category disclosed across the projects.
- Reserves walk — gross (disclosed) — year-by-year reconciliation of the opening balance to the closing balance, broken into Extensions & discoveries, Revisions, Improved recovery, Purchases, Divestitures, Production and Conversion to developed.
- Reserves walk — net change by year — per-year summary of net additions and net deductions across the portfolio.
- NPV (grouped) — all NPV rows captured from the filings, grouped by commodity, resource category, development status and pricing case. Each NPV figure is shown with its discount rate, basis (before-tax / after-tax), currency and value scale.
Ownership / Working interest
- Ownership percentage means the company's working-interest share of the asset: its slice of the project before royalties and before government take. It is shown on a 0–100 scale.
- Mines, oil and gas fields, and processing facilities — this is how much of the asset belongs to the company under that working-interest idea. One hundred percent is fully owned; a lower number usually means partners share the rest.
- Royalties and streaming agreements — the percentage is often not the story; what matters economically is usually the royalty or stream rate, shown elsewhere alongside these figures.
- Oil and gas — read this as gross working interest only. Do not treat it as net production or net wells after royalties; when filings distinguish gross from net, that shows up in how the resource numbers themselves are labelled.
- Below 100% — the short summary for each project names other owners and their stakes when the source says who they are.
- NRI vs WI (O&G). Working interest (WI) is the obligation to pay a share of costs; net revenue interest (NRI) is the share of revenue after royalties and overriding-royalty interests. A 100% WI well rarely produces 100% NRI; typical onshore U.S. NRI is 75–87.5% of WI depending on the lease royalty.
- Operator vs non-operator. The operator runs day-to-day operations; non-operating partners pay their WI share of costs but do not run the asset. Some Portfolio rows show operator share where disclosed.
Unit codes, conversion cheat sheets, cost benchmarks (AISC, C1–C3), reporting standards (NI 43-101, JORC, SEC S-K 1300) and resource/reserve category definitions live in the full terminology & units reference.
Each table lists the numeric band for scores 1–5 (production and resource base; grade where applicable for mining commodities) using the same thresholds as project rating stat cards. Only commodities that appear on featured projects for this document are listed.
Gold
Silver
Copper
Zinc
Lead
Molybdenum
Copper uses Mlb Cu bands because featured projects include lb-scale contained units on copper rows. Lithium grade uses hard-rock % Li₂O bands unless brine-style extraction or brine units appear on featured projects.
Assumptions
- Presented values are denominated in currency of the country where the company is headquartered. Values like market capitalization might differ from the values visible in other parts of the page, where the currency is always USD.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.