Last updated 14 August 2026
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Portfolio Aggregate · 1 project
Portfolio mode — asset rows are for context only; tab totals use the company aggregation.
Altius Minerals Total Royalty Portfolio
Portfolio · Royalty · Operating
Project information
As at 31 December 2025
Description
As at 31 December 2025
Consolidated attributable royalty portfolio: 13 paying mineral royalties across copper, potash, iron ore, nickel-copper-cobalt and lithium plus 13 producing US renewable-energy royalties. Total attributable royalty revenue was C$69.9 million in 2025 (C$64.0 million in 2024).
Portfolio Aggregate
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Stream Operating · 1 project
Chapada
Asset · Stream · Operating
Project information
As at 31 December 2024
Description
As at 31 December 2024
Altius 3.7% copper stream over the Chapada open-pit copper-gold mine in Goias state, Brazil, operated by Lundin Mining. A 24 Mtpa truck-and-shovel mill in continuous operation since 2007, with a life-of-mine plan to approximately 2050 and a near-mine Sauva copper-gold expansion under study. 2025 attributable royalty revenue C$21.5 million.
Stream interests
Multiple effective dates · inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2024
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalty Operating · 11 projects
Rocanville
Asset · Royalty · Operating
Project information
Description
Altius production royalty over Nutrien's Rocanville potash mine in southeastern Saskatchewan, Canada, about 15 km north-east of Rocanville. Conventional room-and-pillar mine operating continuously since 1970; nameplate capacity 6.5 Mtpa finished potash with 5.0 Mtpa operational capability in 2025 and an estimated mine life of about 20 years. 2025 attributable royalty revenue C$8.9 million.
Royalty interests
Multiple effective dates · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Esterhazy
Asset · Royalty · Operating
Project information
As at 31 December 2025
Description
As at 31 December 2025
Altius production royalty over Mosaic's Esterhazy potash facility (K3 shaft plus K1/K2 plants) about 90 km south-east of Yorkton, Saskatchewan, Canada. K3 supplies full capacity following the 2021 closure of the K1 and K2 shafts; audited nameplate capacity 7.8 Mtpa and a life-of-mine plan averaging 6.1 Mtpa to 2078. 2025 attributable royalty revenue C$4.8 million.
Royalty interests
As at 31 December 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Iron Ore Company of Canada (IOC)
Asset · Royalty · Operating
Project information
Description
Altius indirect 7% gross overriding royalty exposure to the Iron Ore Company of Canada operation in the Labrador Trough, held through common shares of Labrador Iron Ore Royalty Corporation. 2025 attributable revenue C$6.3 million.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Voisey's Bay
Asset · Royalty · Operating
Project information
Description
Altius effective 0.3% net value royalty over Vale's Voisey's Bay nickel-copper-cobalt mine in Labrador, Canada, transitioning from open pit to underground mining following the 2024 expansion. 2025 attributable revenue C$1.7 million.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Grota do Cirilo
Asset · Royalty · Operating
Project information
Description
Altius 0.1% gross overriding royalty over Sigma Lithium's Grota do Cirilo hard-rock lithium operation in the Jequitinhonha Valley, Minas Gerais, Brazil. 2025 attributable revenue C$0.2 million.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Tres Quebradas (3Q)
Asset · Royalty · Operating
Project information
Description
Altius 0.1% gross sales royalty over Zijin Mining's Tres Quebradas (3Q) lithium brine project in Catamarca, Argentina, within the Lithium Triangle. 2025 attributable revenue C$0.1 million.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Allan
Asset · Royalty · Operating
Project information
Description
Altius production royalty over Nutrien's Allan potash mine in Saskatchewan, Canada. 2025 attributable royalty revenue C$1.0 million.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Cory
Asset · Royalty · Operating
Project information
Description
Altius production royalty over Nutrien's Cory potash mine in Saskatchewan, Canada. 2025 attributable royalty revenue C$3.1 million.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Patience Lake
Asset · Royalty · Operating
Project information
Description
Altius production royalty over Nutrien's Patience Lake potash mine in Saskatchewan, Canada. 2025 attributable royalty revenue C$0.6 million.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Vanscoy
Asset · Royalty · Operating
Project information
Description
Altius production royalty over Nutrien's Vanscoy potash mine in Saskatchewan, Canada. 2025 attributable royalty revenue C$0.1 million.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Altius Renewable Royalties Portfolio
Segment · Royalty · Operating
Project information
As at 31 December 2025
Description
As at 31 December 2025
Altius's renewable-energy royalty segment, held via a 57% interest in Altius Renewable Royalties Corp. and Great Bay Renewables, over US wind and solar projects: 13 operating royalties (2,868 MW), 6 projects under construction (1,723 MW) and development entitlements exceeding 14,000 MW. 2025 attributable revenue C$13.4 million.
Royalty interests
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalty Construction · 1 project
Curipamba
Asset · Royalty · Construction
Project information
Description
Altius 2% NSR royalty over Silvercorp's Curipamba (El Domo) copper-zinc-gold-silver project in Ecuador, permitted and under construction in 2026 with first production targeted for July 2027.
Royalty interests
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalty Development · 3 projects
Kami
Asset · Royalty · Development
Project information
Description
Altius 3% gross sales royalty over the pre-development Kami iron ore project in the Labrador Trough, western Labrador, Canada. One of two large development-stage royalties (with Arthur Gold) that would materially shift the portfolio's commodity weighting once in production.
Royalty interests
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Arthur Gold
Asset · Royalty · Pre-feasibility
Project information
Description
Altius 0.5% NSR royalty over AngloGold Ashanti's Arthur Gold project (Silicon and Merlin oxide gold deposits) in the Walker Lane belt near Beatty, Nevada. A February 2026 pre-feasibility study declared a maiden Probable reserve at Merlin; mineralization is predominantly oxide (over 95%) with a conventional heap-leach/CIL flowsheet, AISC estimated at about US$954/oz and initial capital of about US$3.6 billion.
Royalty interests
Multiple effective dates · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Gunnison
Asset · Royalty · Development
Project information
Description
Altius development-stage royalty over the Gunnison copper project in Arizona, United States, held as part of the Project Generation-originated royalty pipeline.
Royalty interests
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Assumptions
- The projects listed here reflect the information captured in this workspace and are not necessarily a complete picture of the company's portfolio. For authoritative figures, refer to the company's official filings.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
How to read this tab
- MetalPilot stores contained metal or product in the codes below; grade and tonnage use separate fields. In side-by-side comparison views (stock page Portfolio tab, watchlist By sector), heterogeneous source units are converted to each commodity's preferred display unit (for example Moz Au, kt Cu, MMbbl oil) before summing; the same canonical codes appear in project data.
What the Portfolio tab shows
- The Portfolio tab presents a project-level view of the company's reported assets, built from publicly disclosed information (technical reports, annual filings, MD&A, investor presentations, MRMR / R&R statements, NI 43-101 / NI 51-101 / SEC S-K 1300 / SEC S-K 1200 / JORC / SAMREC / PERC / PRMS / COGEH filings, and similar primary sources).
- Figures are grouped by project type (mining, oil & gas, royalty, stream, processing facility, development, portfolio aggregate) and are shown alongside the headline reserve base, headline production, headline grade / quality, cost benchmarks, estimated lifetime, commercial terms (for royalties / streams), operational capacity (for processing) and a single-figure rating where the underlying data supports one.
- Each data table on the Portfolio tab is followed by ONE Assumptions footnote describing the modelling choices for that table; KPI stat-card assumptions appear in the bottom block instead. All legal and section disclaimers are merged into a single disclaimer list at the bottom of the Portfolio tab.
Concepts in your sector — Royalties & streaming
- A royalty is a contractual share of value extracted (NSR, GRR, NPI, sliding-scale, …). A stream delivers a fixed % of production at an agreed (often discounted) price in exchange for upfront capital.
- Portfolio shows operator reserves restated on royalty/stream economics (volume × rate). Operator classification (NI 43-101, JORC, NI 51-101, SEC) carries through.
- Common terms: Cap (maximum payable); Buy-back (operator repurchase right); AOI (area of interest); Sliding-scale (rate vs commodity price).
Portfolio tab — table guide
- Portfolio KPIs — company-level headline numbers aggregated from the featured projects (project counts, attributable annual production by commodity, attributable resource base by commodity, last filing date, operator share). USD value lines multiply attributable volumes by the resolved snapshot price.
- Portfolio snapshot — one-screen summary of the portfolio: counts by type and status, country mix, reporting standards used, operator share, primary commodity, attributable annual production summary and attributable resource base summary.
- Mining — one row per mining project, with columns for project name, location, status, primary commodities, production (with rating), reserves & resources (with rating), grade (with rating), costs and estimated lifetime. Multi-commodity projects emit one summary row per commodity.
- Oil & Gas — one row per O&G project (typically a field, licence, play or basin asset), with columns for location, status, primary hydrocarbons, production (with rating), reserves & resources (with rating), costs and estimated lifetime.
- Royalty — one row per royalty interest held by the company. Columns cover the underlying project, operator, commodity, commercial terms (rate, type, cap, area-of-interest), attributable production, attributable reserves and estimated lifetime.
- Stream — one row per metal stream held by the company. Each row shows the underlying project, the streamed commodity, the headline stream percentage, the ongoing per-ounce / per-tonne payment, and attributable production / reserves.
- Processing facilities — one row per midstream / processing facility (pipeline, fractionator, LNG train, storage cavern, refinery, smelter, mill, heap-leach pad, CPP, etc.). Columns include nameplate capacity, contracted capacity, feedstock commodities and operational footprint.
- Development — projects in development status or in a pre-production lifecycle phase. The production column is re-labelled 'Targeted production (rating)' to highlight that the figures are plans, not actuals.
- Portfolio Aggregate — a single company-level row used when the company itself publishes a portfolio rollup (e.g. company-wide 2P barrels across all properties).
- Reserves & resources — detail — a leaf-category pivot showing every reserve and resource category disclosed across the projects.
- Reserves walk — gross (disclosed) — year-by-year reconciliation of the opening balance to the closing balance, broken into Extensions & discoveries, Revisions, Improved recovery, Purchases, Divestitures, Production and Conversion to developed.
- Reserves walk — net change by year — per-year summary of net additions and net deductions across the portfolio.
- NPV (grouped) — all NPV rows captured from the filings, grouped by commodity, resource category, development status and pricing case. Each NPV figure is shown with its discount rate, basis (before-tax / after-tax), currency and value scale.
Ownership / Working interest
- Ownership percentage means the company's working-interest share of the asset: its slice of the project before royalties and before government take. It is shown on a 0–100 scale.
- Mines, oil and gas fields, and processing facilities — this is how much of the asset belongs to the company under that working-interest idea. One hundred percent is fully owned; a lower number usually means partners share the rest.
- Royalties and streaming agreements — the percentage is often not the story; what matters economically is usually the royalty or stream rate, shown elsewhere alongside these figures.
- Oil and gas — read this as gross working interest only. Do not treat it as net production or net wells after royalties; when filings distinguish gross from net, that shows up in how the resource numbers themselves are labelled.
- Below 100% — the short summary for each project names other owners and their stakes when the source says who they are.
- NRI vs WI (O&G). Working interest (WI) is the obligation to pay a share of costs; net revenue interest (NRI) is the share of revenue after royalties and overriding-royalty interests. A 100% WI well rarely produces 100% NRI; typical onshore U.S. NRI is 75–87.5% of WI depending on the lease royalty.
- Operator vs non-operator. The operator runs day-to-day operations; non-operating partners pay their WI share of costs but do not run the asset. Some Portfolio rows show operator share where disclosed.
- Consolidation method — how the issuer accounts for the asset. Separate from how much the company owns (ownership %) and who operates it, this accounting treatment decides whether an asset's figures sit inside the company's reported group totals or are stripped out to a single net line. It applies to operating assets (mines, oil & gas fields, processing facilities) and is left blank for royalties, streams, and company-level portfolio rollups.
- Consolidated — the company controls the asset and includes 100% of its figures in the group total; the portion it does not own is carried as a non-controlling interest (NCI). Control is not the same as a majority, so a company can consolidate an asset it holds less than half of. Where ownership is below 100%, the Portfolio shows the NCI percentage (100 minus the company's stake).
- Proportionate — a jointly-operated asset the company includes at its own share, line by line; the share is inside the group total.
- Equity method — an associate or joint venture shown on a single net line, with its revenue excluded from the group total. This is the usual reason a company's reported total is smaller than the sum of its individual assets; the Portfolio flags the share of a commodity total that is equity-accounted.
- Cost / other — a passive or fair-value holding, excluded from the group total.
Unit codes, conversion cheat sheets, cost benchmarks (AISC, C1–C3), reporting standards (NI 43-101, JORC, SEC S-K 1300) and resource/reserve category definitions live in the full terminology & units reference.
Each table lists the numeric band for scores 1–5 (production and resource base; grade where applicable for mining commodities) using the same thresholds as project rating stat cards. Only commodities that appear on featured projects for this document are listed.
Gold
Silver
Copper
Nickel
Lithium
Iron
Potash
Copper uses kt Cu bands; lb-scale copper resources are converted to kt. Lithium grade uses hard-rock % Li₂O bands unless brine-style extraction or brine units appear on featured projects.
Assumptions
- Presented values are denominated in currency of the country where the company is headquartered. Values like market capitalization might differ from the values visible in other parts of the page, where the currency is always USD.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.