Producer · Mid-Tier · Coal · USA
Last updated 21 June 2026
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Operating · 6 projects
Marfork
Asset
Project information
As at 31 December 2025
Description
As at 31 December 2025
Mining complex located in Raleigh, Boone, Kanawha, and Fayette counties, West Virginia. Comprises three active underground mines producing High-Vol. A met coal from the Eagle seam, one underground mine producing mid-vol met coal from the Glen Alum Tunnel seam, and two active surface mines. Coal is processed at the Marfork Preparation Plant.
Mining metrics
As at 31 December 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Aracoma
Asset
Project information
As at 31 December 2025
Description
As at 31 December 2025
Underground mining complex located in Logan, Mingo, and Boone counties, West Virginia. Comprises three active underground mines producing primarily High-Vol. B quality met coal from the Upper Chilton, Upper Cedar Grove, and No. 2 Gas coal seams. Coal is processed at the Bandmill Preparation Plant and loaded onto CSX rail.
Mining metrics
As at 31 December 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
McClure/Toms Creek
Asset
Project information
As at 31 December 2025
Description
As at 31 December 2025
Mining complex located in Dickenson, Buchanan, Russell, and Wise counties, Virginia. Comprises three active underground mines producing High-Vol. A and Mid-Vol. met coal from the Upper Banner, Lower Banner, and Jawbone seams, plus one active and one idle surface mine. Coal is processed at the McClure or Toms Creek Preparation Plants.
Mining metrics
As at 31 December 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Power Mountain
Asset
Project information
As at 31 December 2025
Description
As at 31 December 2025
Underground mining complex located in Nicholas and Clay counties, West Virginia. Comprises two active underground mines producing High-Vol. B met coal from the Eagle and Powellton seams. Coal is processed at the Power Mountain Preparation Plant and the Mammoth Preparation Plant.
Mining metrics
As at 31 December 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Kepler
Asset
Project information
As at 31 December 2025
Description
As at 31 December 2025
Underground mining complex located in Wyoming and McDowell counties, West Virginia. Comprises one active underground mine producing primarily Low-Vol. quality met coal from the Pocahontas No. 3 coal seam. Coal is processed at the Kepler Preparation Plant and loaded onto NS rail or trucked to the Feats Loadout.
Mining metrics
As at 31 December 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Kingston/Mammoth
Asset
Project information
As at 31 December 2025
Description
As at 31 December 2025
Mining complex located in Fayette and Raleigh counties, West Virginia. Comprises one active underground mine producing Mid-Vol. met coal from the Douglas seam, and two active surface mines producing High-Vol. A met coal and thermal coal. Development began on the new Wildcat underground mine in 2024, targeting Low-Vol. met coal from the Sewell seam with production expected in Q1 2026.
Mining metrics
As at 31 December 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Suspended · 1 project
Elk Run
Asset · Suspended
Project information
As at 31 December 2025
Description
As at 31 December 2025
Underground mining complex located in Boone County, West Virginia. The Checkmate Powellton mine commenced production in December 2023 producing High-Vol. B met coal from the Powellton seam. The complex was temporarily idled in November 2024 due to a softening in the met coal pricing environment and relatively higher costs during the start-up period.
Mining metrics
As at 31 December 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Processing facilities · 1 project
Dominion Terminal Associates
Asset · Other · Ownership 65%
Project information
As at 31 December 2025
Description
As at 31 December 2025
Coal export terminal located in Newport News, Virginia. Provides storage capacity, transportation flexibility, and coal blending capabilities to fulfill a broad range of customer coal quality requirements. Alpha holds a 65.0% partnership interest.
Processing facilities
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Assumptions
- The projects listed here reflect the information captured in this workspace and are not necessarily a complete picture of the company's portfolio. For authoritative figures, refer to the company's official filings.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
How to read this tab
- The tables below list unit codes most often used in the Energy Metals sector for this company. MetalPilot stores contained metal or product in the codes below; grade and tonnage use separate fields. In side-by-side comparison views (stock page Portfolio tab, watchlist By sector), heterogeneous source units are converted to each commodity's preferred display unit (for example Moz Au, kt Cu, MMbbl oil) before summing; the same canonical codes appear in project data.
What the Portfolio tab shows
- The Portfolio tab presents a project-level view of the company's reported assets, built from publicly disclosed information (technical reports, annual filings, MD&A, investor presentations, MRMR / R&R statements, NI 43-101 / NI 51-101 / SEC S-K 1300 / SEC S-K 1200 / JORC / SAMREC / PERC / PRMS / COGEH filings, and similar primary sources).
- Figures are grouped by project type (mining, oil & gas, royalty, stream, processing facility, development, portfolio aggregate) and are shown alongside the headline reserve base, headline production, headline grade / quality, cost benchmarks, estimated lifetime, commercial terms (for royalties / streams), operational capacity (for processing) and a single-figure rating where the underlying data supports one.
- Each data table on the Portfolio tab is followed by ONE Assumptions footnote describing the modelling choices for that table; KPI stat-card assumptions appear in the bottom block instead. All legal and section disclaimers are merged into a single disclaimer list at the bottom of the Portfolio tab.
Concepts in your sector — Energy metals (uranium)
- U₃O₈ vs U metal. Reserves are usually in lb or t U₃O₈; multiply by ~0.848 for U metal. Fuel-cycle contracts may quote kgU as UF₆ (schema: kgu).
- % U₃O₈ vs ppm U₃O₈. Athabasca grades can exceed 10%; ISR deposits often 0.05–0.5%. The schema preserves the source unit.
- ISR vs conventional. ISR tonnage is often m³ leach solution, not rock mass — cost structure differs from underground/open-pit.
Portfolio tab — table guide
- Portfolio KPIs — company-level headline numbers aggregated from the featured projects (project counts, attributable annual production by commodity, attributable resource base by commodity, last filing date, operator share). USD value lines multiply attributable volumes by the resolved snapshot price.
- Portfolio snapshot — one-screen summary of the portfolio: counts by type and status, country mix, reporting standards used, operator share, primary commodity, attributable annual production summary and attributable resource base summary.
- Mining — one row per mining project, with columns for project name, location, status, primary commodities, production (with rating), reserves & resources (with rating), grade (with rating), costs and estimated lifetime. Multi-commodity projects emit one summary row per commodity.
- Royalty — one row per royalty interest held by the company. Columns cover the underlying project, operator, commodity, commercial terms (rate, type, cap, area-of-interest), attributable production, attributable reserves and estimated lifetime.
- Stream — one row per metal stream held by the company. Each row shows the underlying project, the streamed commodity, the headline stream percentage, the ongoing per-ounce / per-tonne payment, and attributable production / reserves.
- Processing facilities — one row per midstream / processing facility (pipeline, fractionator, LNG train, storage cavern, refinery, smelter, mill, heap-leach pad, CPP, etc.). Columns include nameplate capacity, contracted capacity, feedstock commodities and operational footprint.
- Development — projects in development status or in a pre-production lifecycle phase. The production column is re-labelled 'Targeted production (rating)' to highlight that the figures are plans, not actuals.
- Portfolio Aggregate — a single company-level row used when the company itself publishes a portfolio rollup (e.g. company-wide 2P barrels across all properties).
- Reserves & resources — detail — a leaf-category pivot showing every reserve and resource category disclosed across the projects.
- NPV (grouped) — all NPV rows captured from the filings, grouped by commodity, resource category, development status and pricing case. Each NPV figure is shown with its discount rate, basis (before-tax / after-tax), currency and value scale.
Ownership / Working interest
- Ownership percentage means the company's working-interest share of the asset: its slice of the project before royalties and before government take. It is shown on a 0–100 scale.
- Mines, oil and gas fields, and processing facilities — this is how much of the asset belongs to the company under that working-interest idea. One hundred percent is fully owned; a lower number usually means partners share the rest.
- Royalties and streaming agreements — the percentage is often not the story; what matters economically is usually the royalty or stream rate, shown elsewhere alongside these figures.
- Oil and gas — read this as gross working interest only. Do not treat it as net production or net wells after royalties; when filings distinguish gross from net, that shows up in how the resource numbers themselves are labelled.
- Below 100% — the short summary for each project names other owners and their stakes when the source says who they are.
- NRI vs WI (O&G). Working interest (WI) is the obligation to pay a share of costs; net revenue interest (NRI) is the share of revenue after royalties and overriding-royalty interests. A 100% WI well rarely produces 100% NRI; typical onshore U.S. NRI is 75–87.5% of WI depending on the lease royalty.
- Operator vs non-operator. The operator runs day-to-day operations; non-operating partners pay their WI share of costs but do not run the asset. Some Portfolio rows show operator share where disclosed.
Unit codes, conversion cheat sheets, cost benchmarks (AISC, C1–C3), reporting standards (NI 43-101, JORC, SEC S-K 1300) and resource/reserve category definitions live in the full terminology & units reference.
Each table lists the numeric band for scores 1–5 (production and resource base; grade where applicable for mining commodities) using the same thresholds as project rating stat cards. Only commodities that appear on featured projects for this document are listed.
Coal
Copper uses kt Cu bands (Mlb Cu when lb-scale copper resources appear on featured projects). Lithium grade uses hard-rock % Li₂O bands unless brine-style extraction or brine units appear on featured projects.
Assumptions
- Presented values are denominated in currency of the country where the company is headquartered. Values like market capitalization might differ from the values visible in other parts of the page, where the currency is always USD.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.