Permian Gathering System
Project information
As at 31 December 2025
Type:
Processing Facility
Type:
Processing Facility
Aggregation level:
Asset
Aggregation level:
Asset
Status:
Operating
Status:
Operating
Report standard:
-
Report standard:
-
Ownership %:
100
Ownership %:
100
Operator:
Yes
Operator:
Yes
Extraction:
Processing Facility
Extraction:
Processing Facility
Country:
United States
Country:
United States
Region:
Texas
Region:
Texas
Geological province:
Permian Basin
Geological province:
Permian Basin
Facility kind:
Gathering System
Facility kind:
Gathering System
Licensed capacity:
0.1
Licensed capacity:
0.1
Capacity unit:
bcf
Capacity unit:
bcf
Capacity period:
Per Day
Capacity period:
Per Day
Capacity kind:
Nameplate
Capacity kind:
Nameplate
Description
As at 31 December 2025
Consolidated natural gas gathering system of approximately 105 pipeline miles with 0.1 Bcf/d of inlet capacity.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.