Calcasieu Pass Project
Project information
As at 31 December 2025
Description
As at 31 December 2025
First operating LNG export facility; achieved commercial operation date on April 15, 2025. Comprises 18 mid-scale liquefaction trains, two 200,000-cubic-meter cryogenic LNG storage tanks, a 620 MW nominal / 720 MW peak power island, three gas pre-treatment units and two berths, fed by the 24-mile TransCameron interstate pipeline. Post-COD contracted portfolio totals 11.2 mtpa (8.5 mtpa long-term 20-year FOB, 1.5 mtpa medium-term, 1.2 mtpa excess to VG Commodities). A potential bolt-on expansion of up to 4.5 mtpa has been identified.