Southeast Virginia Energy Storage Project
Project information
As at 31 December 2025
Type:
Processing Facility
Type:
Processing Facility
Aggregation level:
Asset
Aggregation level:
Asset
Status:
Development
Status:
Development
Report standard:
-
Report standard:
-
Ownership %:
60
Ownership %:
60
Operator:
Yes
Operator:
Yes
Extraction:
Lng
Extraction:
Lng
Country:
United States
Country:
United States
Region:
southeast Virginia
Region:
southeast Virginia
Facility kind:
Storage Gas
Facility kind:
Storage Gas
Licensed capacity:
-
Licensed capacity:
-
Capacity unit:
-
Capacity unit:
-
Capacity period:
-
Capacity period:
-
Capacity kind:
-
Capacity kind:
-
Description
As at 31 December 2025
US$0.3 billion LNG peaking facility approved November 2024 to serve an existing LDC's growing winter peak day load, mitigate peak day pricing exposure and increase operational flexibility on the Columbia Gas system. Anticipated in-service 2030.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.