Description
As at 31 December 2025
Expansion of the ANR system approved April 2025, designed to provide 0.4 Bcf/d of capacity to serve natural gas-fired electric generation demand in the US Midwest, including expected data centres. Involves pipeline looping, compressor additions and system updates; anticipated in-service late 2029 with an estimated cost of approximately US$0.9 billion.