Yellowhead Copper Project
Project information
As at 1 June 2025
Description
As at 1 June 2025
Remobilized polymetallic volcanogenic massive sulphide deposit hosted within the Eagle Bay Assemblage. Located approximately 150 km northeast of Kamloops, British Columbia, with paved highway and rail access within 8 km. Property consists of one mining lease and 94 mineral claims covering ~42,358 hectares. Acquired by Taseko in 2019 through the acquisition of Yellowhead Mining Inc. July 2025 Technical Report outlines a 90,000 tpd open-pit operation over a 25-year mine life, producing an average of 178 million pounds of copper annually. Environmental Assessment process formally commenced in June 2025.
Mining metrics
As at 1 June 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 1 June 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.