Gibraltar Mine
Project information
As at 31 December 2025
Description
As at 31 December 2025
Calc-alkalic porphyry copper-molybdenum deposit hosted by the Granite Mountain batholith, comprising the Granite, Pollyanna, Connector, Gibraltar, and Extension zones. Located 65 km north of Williams Lake, British Columbia, accessed via paved road with rail service via CN to Vancouver Wharves, and grid power from BC Hydro. Property covers ~26,588 hectares of mining leases and mineral claims. Acquired from Boliden in 1999 and restarted in 2004. Two bulk sulphide concentrators with a combined design capacity of 85,000 tpd, plus a dedicated molybdenum flotation plant and an SX/EW facility for oxide ore. Crusher 1 was relocated and recommissioned in 2024 to allow mining of the Connector Pit. Flagship Canadian copper asset.
Mining metrics
As at 31 December 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.