Quebrada Blanca — silver & copper mine
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Quebrada Blanca (QB) is a large open-pit copper-molybdenum mine in the Tarapacá Region of northern Chile. Teck holds a 60% indirect interest in QBSA; Sumitomo Metal Mining / Sumitomo Corporation hold 30%, with Codelco (10%, non-funding preference share). Commercial production commenced in March 2024. 2025 throughput was constrained by the pace of tailings management facility (TMF) sand-wedge development; from 2027 onward TMF is expected to no longer constrain production. A study to debottleneck plant throughput to 165-185 ktpd is underway with a DIA permit application not expected before end-2026. The proximity to the Collahuasi operation underpins potential US$1.4B annual EBITDA uplift from integration. 2025 Q4 grades averaged 0.59% Cu; recoveries within plan. Shiploader (port facility) repairs completed end-January 2026.
Mining metrics
Multiple effective dates · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.