Highland Valley Copper โ molybdenum mine
Data compiled from public filings โ information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Highland Valley Copper Operations (HVC) is Canada's largest copper mine, located in south-central British Columbia. Mining occurs at the Lornex, Valley, Bethlehem and Highmont pits and is supported by an SAG and ball-mill concentrator. On July 23, 2025 Teck's Board sanctioned the HVC Mine Life Extension (MLE) project, which will extend the operation from 2028 to 2046 with average copper production of ~132 ktpa over the life of the mine. HVC MLE total project capital cost is estimated at C$2.1-2.4 billion (2025-2028); 2025 spend was C$330 million; 2026 capex guidance is C$900M-C$1.2B. Higher Lornex feed contributed to higher 2025 grades and recoveries.
Mining metrics
Multiple effective dates ยท exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources โ detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright ยฉ 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.