Japa Gold Project
Project information
As at 31 July 2020
Description
As at 31 July 2020
Advanced exploration gold project centered on the Adiembra deposit. Located in the Western Region of Ghana, approximately 110 km southwest of Kumasi and 50 km north of Tarkwa. Property comprises a 26.20 square kilometer mining lease within the Akropong Belt, an offshoot of the Ashanti Belt developed within the Birimian Supergroup. Mineralization includes laterite and parallel lodes. A drilling program is proposed to identify extensions to the laterite mineralization and define southern extensions.
Mining metrics
As at 31 July 2020 · inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 July 2020
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.