GC Mine (Gaocheng)
Data compiled from public filings โ information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 30 June 2024
Description
As at 30 June 2024
99%-owned underground silver-lead-zinc mine in Gaocun Township, Yun'an District, Yunfu City, Guangdong Province, China. Commercially operating since Q2 2014. Polymetallic mesothermal vein-infill style of deposit. UG mining via mobile rubber-tired equipment (Stage 1) and tracked equipment + shaft (Stage 2) down to -300 mRL; Stage 3 design extends mining from -300 to -500 mRL. Mining methods: traditional shrinkage, resuing, and overhand cut-and-fill. Processing plant 1,600 tpd nameplate (~900-950 tpd per parallel circuit). 2024 LOM schedule ramps annual ore production from ~313 to 363 kt by FY2026, ~5.0 Mt LOM. Plus dry-stack TSF; intelligent pre-sorting system replaced manual hand-sorting in 2023.
Mining metrics
Multiple effective dates ยท inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources โ detail
As at 30 June 2024
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright ยฉ 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.