Cerro Las Minitas — silver & gold project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 20 March 2024
Description
As at 20 March 2024
Silver-lead-zinc CRD/skarn complex comprising seven deposits including Blind, El Sol, Las Victorias, Skarn Front, South Skarn, and Bocona. Located ~70 km northeast of Durango, accessed via federal highways with grid power ~7 km away. Property comprises 25 concessions totaling ~27,451 hectares, unburdened by royalties. Acquired 100% control in 2020 after purchasing Electrum's 60% interest. 2024 PEA outlines a 5,300 tpd underground mine over a 17-year LOM producing 11.4 Moz AgEq/yr at AISC of US$13.23/oz AgEq, with initial capex of US$388M and after-tax NPV5 of US$501M / IRR 21.2% at US$23/oz Ag. Flagship Mexican silver asset.
Mining metrics
Multiple effective dates | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 20 March 2024
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.