Marigold
Project information
As at 31 December 2025
Description
As at 31 December 2025
100%-owned open-pit run-of-mine heap-leach gold mine in Humboldt County, Nevada, USA. Includes Marigold Mine and Buffalo Valley satellite deposit, plus a substantial leach pad inventory. Reserves at $1,700/oz Au; ROM heap leach with metallurgical recovery 65-72%; cut-off 0.069 g/t payable gold (Marigold) and 0.12-0.72 g/t (Buffalo Valley). Contributed 33% of 2025 SSR revenue.
Mining metrics
Multiple effective dates · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.