Pilares — copper & molybdenum project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Satellite high-grade copper deposit ~6 km from the La Caridad complex in Sonora, Mexico; developed as an open-pit operation with ore haulage by truck to the La Caridad mill. Carried at probable reserves of 22.3 Mt @ 0.80% Cu (mill) plus 1.9 Mt leach material; no production recorded through 2025 in the company's per-mine production series. S-K 1300 TRS shared with La Caridad (Exhibit 96.7).
Mining metrics
As at 31 December 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.