Rio Tinto Group Portfolio — gold & silver mine
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
[Partial extraction — source text contained corrupted prose sections; tables recovered where machine-readable] Group production rollup across Aluminium (bauxite-alumina-aluminium chain), Copper (Kennecott, Escondida 30%, Oyu Tolgoi 66%), Iron Ore (Pilbara, IOC, Simandou first ore 2025), Lithium (Arcadium acquired 6 March 2025), Minerals (borates, TiO2 feedstock, diamonds, salt). 2025: iron ore 289.6 Mt (share), mined copper 735 kt (share; consolidated-basis 883 kt), bauxite 62.4 Mt, aluminium 3.38 Mt, lithium ~57 kt LCE. Ore Reserves stated under JORC as at 31 December 2025; Mineral Resources tables (AR pp.292-303) not extracted in this pass — queued for supplement.
Portfolio Aggregate
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.