Cedar LNG — natural gas project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Floating LNG export facility with nameplate capacity of 3.3 mtpa, located in the traditional territory of the Haisla Nation on Canada's West Coast and powered by renewable BC Hydro electricity, making it one of the lowest-emitting LNG facilities in the world. A 50/50 joint venture between Pembina and the Haisla Nation; at year-end 2025 the floating LNG vessel was over 35% complete. Liquefaction capacity is fully contracted under 20-year take-or-pay tolling agreements: ARC Resources (1.5 mtpa), Pembina (1.5 mtpa), PETRONAS (1.0 mtpa) and Ovintiv (0.5 mtpa, 12-year).
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.