Mogale Tailings Retreatment
Mining
Type
Operating
Status
🇿🇦 South Africa, Gauteng (Witwatersrand Basin)
Country
Project information
As at 30 June 2025
Aggregation level:
Asset
Aggregation level:
Asset
Report standard:
Samrec
Report standard:
Samrec
Ownership %:
100
Ownership %:
100
Operator:
Yes
Operator:
Yes
Extraction:
Surface
Extraction:
Surface
Description
As at 30 June 2025
Surface tailings retreatment operation exploiting tailings deposited on the Mogale Cluster and Soweto Cluster TSFs. Production commenced in 2024.
Mining metrics
As at 30 June 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 30 June 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.