Crude Oil Segment
Project information
As at 31 December 2025
Description
As at 31 December 2025
Gathering and transportation of crude oil via pipelines (including gathering systems), trucks, barges and railcars, plus terminalling, storage and related services across an integrated U.S. and Canadian footprint. Includes 20,405 miles of active pipelines (9,490 in the Permian Basin alone), 42 million barrels of active above-ground tank capacity, a 120,000 bpd condensate processing facility, eight crude rail terminals (264,000 bpd loading / 380,000 bpd unloading) and over 2.8 million bpd of Permian takeaway capacity to Corpus Christi, Houston and Cushing. Largest terminals are at Cushing, St. James, Midland and Patoka. 2025 average tariff volume of 9,680 thousand bpd.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.