Algeria
Project information
As at 31 December 2025
Description
As at 31 December 2025
OXY's interests in Algeria consist of production rights in 18 fields within Blocks 404a and 208 (both expiring 2048), located in the Berkine Basin in Algeria's Sahara Desert. Also owns interests in 3 unitized fields within Blocks 404a/208 (Ourhoud Unit, EMK Unit, HBN Unit) and 3 processing facilities: El Merk central processing facility in Block 208 (processes oil/NGL/gas); Hassi Berkine South and Ourhoud central processing facilities in Block 404a (process oil). 2025 net production 28 Mboe/d from 219 gross wells; annual development capital ~$0.1B.
Oil & Gas metrics
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.