Eiger Express Pipeline
Project information
As at 31 December 2025
Description
As at 31 December 2025
New approximately 450-mile, 48-inch natural gas pipeline designed to transport up to approximately 3.7 Bcf/d from the Permian Basin to Katy, Texas, announced in 2025 with WhiteWater, MPLX LP and Enbridge Inc. through the existing Matterhorn joint venture. WhiteWater will construct and operate the pipeline; ONEOK's total interest is 25.5% (15% direct in Eiger plus the remainder via Matterhorn). Expected in-service mid-2028.