Rook I Project (Arrow Deposit)
Data compiled from public filings โ information only, not investment advice. AI‑assisted; see methodology.
Project information
Description
100%-owned development-stage uranium project in the southwestern Athabasca Basin, ~40 km east of the Alberta-Saskatchewan border and 150 km north of La Loche, accessed via all-weather Highway 955 and a 13 km access road. Hosts the Arrow Deposit, discovered February 2014: a basement-hosted, vein-type deposit within the A0-A5 shears, 315 m wide over 980 m of strike, extending from 100 m to 980 m depth and open in most directions. The 2021 Feasibility Study contemplates two shafts, conventional transverse and longitudinal longhole mining at a nominal 1,300 t/d with an underground tailings management facility, paste backfill, 97.6% metallurgical recovery and an LNG power plant. Provincial EA approval November 2023; CNSC accepted the Final Federal EIS January 2025; hearing concluded February 2026, decision pending. The August 2024 Interim Trend Update indicated pre-production capital of ~C$2.2B (FS: C$1.3B). The Rook I property comprises 32 contiguous claims totalling 35,065 ha within SW2; certain claims carry a 2% NSR to Advance Royalty Corporation (reducible to 1% for $1.0M).
Mining metrics
Multiple effective dates ยท inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources โ detail
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright ยฉ 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.