Allan Potash Mine
Project information
As at 31 December 2025
Description
As at 31 December 2025
Allan potash mine ~45 km east of Saskatoon, Saskatchewan. Conventional underground mining of Patience Lake Member A Zone (3.35 m thick, ~1,000 m depth). 100% owned. Built 1968. Major expansion completed 2013 brought nameplate to 4.0 Mtpa finished potash products. 2025 operational capability 2.7 Mtpa. Total potash produced since 1968: 70.494 Mt from 199.502 Mt ore. Allan Crown Lease KL 112R C covers 80,950 hectares (200,032 acres). Leased potash mineral rights for 50,690 ha Crown + 27,071 ha Freehold. 51-year mine life remaining.
Mining metrics
Multiple effective dates · inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.