Brazil Steel Segment
Project information
As at 31 December 2025
Description
As at 31 December 2025
Brazil segment - ArcelorMittal Tubarão (6.8 Mtpa integrated flat, Vitoria) + ArcelorMittal Brasil (Monlevade 1.1 Mtpa long, Juiz de Fora/Piracicaba 1.9 Mtpa mini-mill, Barra Mansa/Resende 0.9 Mtpa mini-mill) + ArcelorMittal Pecém (3.0 Mtpa integrated flat, deepwater port access) + Acindar Argentina (0.6 Mtpa mini-mill, Villa Constitucion) + Vega Downstream + Tuper (acquired May 2025) + Tekno (acquired Nov 2025). 7 BF + 7 EAF. New cold rolling+coating line at Tubarão under development. Sections mill at Barra Mansa completed H2 2025.