SCM Mine
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Large-scale nickel laterite mining operation producing limonite and saprolite ores. Located in Konawe, Southeast Sulawesi, approximately 50 km southwest of IMIP. Property covers a 21,100-hectare concession area. Saprolite ore is supplied to the RKEF Smelters at IMIP, while limonite ore feeds the HPAL projects. A 50-km haul road connecting the mine to IMIP is under construction, targeted for completion in H1 2026. Flagship upstream nickel asset.
Mining metrics
As at 31 December 2025 | inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.