AIM I Operation
Project information
As at 31 December 2025
Description
As at 31 December 2025
Modern processing facility located at IMIP, designed to process residual iron ore and pyrite from the Wetar Copper Mine. Produces sulfuric acid, steam, iron ore pellets, copper cathode, gold, and silver. Sulfuric acid and steam are utilized as critical inputs for HPAL plants.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.