Sabine Pass LNG Terminal (SPL Project)
Project information
As at 31 December 2025
Description
As at 31 December 2025
One of the largest LNG production facilities in the world with over 30 mtpa of total production capacity in operation, owned and operated through Cheniere Energy Partners, L.P. (Cheniere owns 100% of the general partner, a 48.6% limited partner interest and 100% of incentive distribution rights). Five LNG storage tanks (~17 Bcfe aggregate), vaporizers with ~4 Bcf/d regasification capacity and three marine berths (two up to 266,000 m3, one up to 200,000 m3). FERC/DOE approved export volumes of 1,661.94 Bcf/yr (33 mtpa) to FTA and non-FTA countries through December 31, 2050. SPLNG holds a long-term 1 Bcf/d third-party TUA with TotalEnergies; ~2 Bcf/d of remaining regas capacity reserved by SPL. Planned large-scale maintenance completed on two Trains in Q2 2025. Feedstock secured partly through long-term gas supply agreements including an IPM agreement.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.