Kainantu Gold Mine
Data compiled from public filings โ information only, not investment advice. AI‑assisted; see methodology.
Project information
Description
High-grade, low-cost underground gold-copper-silver mining complex hosting the producing Kora and Judd intrusion-related vein deposits plus the Kora South, Judd South and Irumafimpa deposits, within an 836 km2 land package 180 km west-northwest of Lae. Acquired from Barrick Gold in 2015, restarted 2016, commercial production declared February 2018. Veins are hosted in the Bena Bena Formation with sub-vertical quartz-sulphide lodes up to 10 m wide and over 1,000 m of vertical extent. The Stage 3 Expansion, a standalone 1.2 Mtpa process plant, was commissioned in December 2025 under budget with commercial production effective January 1, 2026; the Stage 4 Expansion to 1.8 Mtpa is scheduled for commissioning in late 2027. Updated DFS (filed March 2025) outlines a 7-year mine life to 2030, post-tax NPV5% of US$680.5M and LOM total capital of US$540.5M. Pastefill plant commissioning planned for 2026 to place ~74% of tailings underground. ML150 extended to June 13, 2034; 100% of concentrate sold to Trafigura at LME spot prices.
Mining metrics
Multiple effective dates ยท exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources โ detail
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright ยฉ 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.