Judd
Project information
Description
Producing vein deposit of the Kainantu Gold Mine, subparallel to and approximately 90-150 m east of the Kora deposit, located entirely within mining lease ML150 and accessed from existing near-mine underground infrastructure. The Judd vein system comprises multiple veins from J1W and J1 in the west to J3 in the east across a 60-80 m wide package, with mineralization style similar to Kora (intrusion-related gold-copper-silver quartz-sulphide veins). First significant exploration by K92 was a 2020 bulk sample from the Judd #1 Vein; Judd became a new mining front in October 2021 following promising drilling, development and metallurgical results, and a maiden resource was declared in February 2022. The December 2023 resource update increased measured and indicated ounces by 167% and inferred ounces by 211% versus 2021. Ongoing underground drilling targets Judd, Judd South and Judd Deeps, with 2025-2026 drilling extending the high-grade dilatant zone; Judd North is a 2026 surface exploration target.
Mining metrics
Multiple effective dates · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.