Arakompa
Project information
Description
Near-mine exploration property located approximately 4.5 km from the Kainantu Gold Mine process plant, hosting a historic resource that makes it a high-priority follow-up target. A maiden surface diamond drill program commenced in 2024; first results (February 2024) and subsequent 2025 results confirmed two significant thick high-grade subparallel veins, a southern strike extension and a bulk-tonnage zone expanded by approximately 150 m to the south for a total strike length of approximately 900 m. The fifth set of results (September 2025) significantly expanded the bulk zone and identified a potential porphyry discovery within a 600 m x 600 m copper-in-soils anomaly. Arakompa is a focus of the enlarged $31-35 million 2026 surface exploration program alongside Maniape and Judd North. No current mineral resource estimate is disclosed for the property in this AIF.
Mining metrics
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.