Rimbey Gas Plant
Project information
As at 31 December 2025
Description
As at 31 December 2025
Full-service sour gas plant 100 km southwest of Edmonton with 422 MMcf/d licensed capacity, NGL extraction, NGL fractionation (28,000 Bbls/d), ethane extraction (20,000 Bbls/d) and sulphur recovery. Terminus of Keyera's Keylink pipeline, connected to the Edmonton/Fort Saskatchewan area via the Rimbey Pipeline and the Alberta Ethane Gathering System. 2025 average daily throughput 204 MMcf/d.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.